Go Solar Energy NC
North Carolina solar installer providing fast, affordable residential and commercial installations with 24/7 availability
8+
Years in Business
40
Customer Reviews
124 mi
Service Area
11-50
Employees
SurgePV Score
About Go Solar Energy NC
Go Solar Energy NC is a solar installation company based in Raleigh, NC, serving homeowners and businesses across the state. The company designs and builds residential, commercial, and industrial solar systems and provides ongoing activation and maintenance services. Go Solar Energy NC positions itself as one of the most affordable solar providers in North Carolina, creating customized packages based on each customer’s location, energy needs, and goals.
The company’s team includes experienced solar technicians with decades of combined expertise in the sustainable energy sector. Go Solar Energy NC installs panels from Q Cells and Canadian Solar, paired with Enphase and SolarEdge inverters and Tesla Powerwall and Enphase battery storage. The company handles every stage of the project from initial design through permitting, installation, and utility interconnection.
Go Solar Energy NC maintains a 4.7-star average across customer reviews and emphasizes 100% customer satisfaction as a core value. The company is open 24/7 for inquiries and serves major markets including Raleigh, Durham, Greensboro, Winston-Salem, and Fayetteville. Customers frequently highlight the competitive pricing and fast project timelines in their reviews.
Service Area
Go Solar Energy NC serves the following areas within a 124-mile radius:
Contact Information
Are you Go Solar Energy NC?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
40 reviews
Jason L.
Go Solar Energy NC made the whole process easy. They helped us understand financing options and designed a system that covers 100% of our usage. Installation was quick and the team was friendly and professional.
Nicole M.
Fast turnaround from signing to installation. The crew was efficient and the system started producing power the same week the utility approved the interconnection. Our electric bill dropped from $230 to under $20.
Frank D.
Good value for the price. The system is performing well and the team was responsive during the installation process. Took a bit longer than expected for the city permits but that is typical in our area.
Frequently Asked Questions About Go Solar Energy NC
What services does Go Solar Energy NC offer?
Go Solar Energy NC offers Solar Installation, Battery Storage, Solar Design, Commercial Solar, Maintenance.
Is Go Solar Energy NC NABCEP certified?
Go Solar Energy NC holds the following certifications: NC Licensed Contractor. Contact them directly for the latest accreditation details.
What areas does Go Solar Energy NC serve?
Go Solar Energy NC serves Raleigh, Durham, Greensboro, Winston-Salem, Fayetteville, Charlotte, Cary. They are based in Raleigh with a service radius of 200 km.
What warranty does Go Solar Energy NC offer?
Go Solar Energy NC offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Go Solar Energy NC's customer reviews?
Go Solar Energy NC has a 4.7/5 rating based on 40 customer reviews. Customers consistently rate them highly.
How long has Go Solar Energy NC been in business?
Go Solar Energy NC was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in Raleigh
Get a Free Solar Quote from Go Solar Energy NC
Fill in your details and we'll connect you with Go Solar Energy NC.
Quote request sent!
Go Solar Energy NC will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile