Green Building Renewables Colchester
Award-winning in-house solar and heat pump installation team serving Colchester since 2009
17+
Years in Business
305
Customer Reviews
60 km
Service Area
11-50
Employees
SurgePV Score
About Green Building Renewables Colchester
Green Building Renewables Colchester is the local branch of the national Green Building Renewables network, operating from B23 Moorside Business Park, Moorside, Colchester, Essex CO1 2ZF. The Colchester operation has served the area since 2009, originally under the name Eco East Anglia before being incorporated into the Green Building Renewables group.
The team installs solar panels, battery storage, air source heat pumps, ground source heat pumps, and EV charge points for residential and commercial properties across Colchester, Chelmsford, Ipswich, and the surrounding Essex area. Unlike many installers, Green Building Renewables uses only directly employed in-house engineers — no subcontractors — for all installations. The company holds NICEIC, MCS, RECC, FGAS, and REFCOM accreditations.
The Colchester team won multiple awards at the Energy Efficiency Regional Awards 2023, including Solar PV Installer of the Year and Renewable Heat Installer of the Year. The company can be contacted directly at [email protected] or by phone on 01206 323834.
Service Area
Green Building Renewables Colchester serves the following areas within a 60 km radius:
Contact Information
Are you Green Building Renewables Colchester?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
No reviews yet.
Frequently Asked Questions About Green Building Renewables Colchester
What services does Green Building Renewables Colchester offer?
Green Building Renewables Colchester offers Solar Installation, Battery Storage, EV Charging, Maintenance, Energy Audit.
Is Green Building Renewables Colchester MCS certified?
Yes, Green Building Renewables Colchester is MCS certified and also holds NICEIC, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Green Building Renewables Colchester serve?
Green Building Renewables Colchester serves Colchester, Chelmsford, Ipswich, Braintree, Clacton-on-Sea. They are based in Colchester with a service radius of 60 km.
What warranty does Green Building Renewables Colchester offer?
Green Building Renewables Colchester offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Green Building Renewables Colchester's customer reviews?
Green Building Renewables Colchester has a 4.3/5 rating based on 305 customer reviews. They are well-regarded by their customers.
How long has Green Building Renewables Colchester been in business?
Green Building Renewables Colchester was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Colchester
Get a Free Solar Quote from Green Building Renewables Colchester
Fill in your details and we'll connect you with Green Building Renewables Colchester.
Quote request sent!
Green Building Renewables Colchester will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile