Green Convergence
SunPower Master Dealer in the Greater Los Angeles area with 3,500+ installations and a 50-year warranty
18+
Years in Business
3,500+
Projects Completed
222
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About Green Convergence
Green Convergence is a trusted solar installation company headquartered at 28476 Westinghouse Place in Valencia, California, serving the Greater Los Angeles area since 2008. With more than 3,500 completed solar panel installations, the company has established itself as the exclusive SunPower Master Dealer in the Valencia and Santa Clarita Valley region. Green Convergence holds NABCEP certification and an A+ rating from the Better Business Bureau.
The company installs premium panels from Maxeon, Panasonic, and REC, paired with Enphase or SolarEdge inverters and Tesla Powerwall battery storage. Green Convergence handles every project from initial site assessment and system design through permitting, installation, and interconnection with the local utility. Their service area spans from Ventura and Thousand Oaks through the San Fernando Valley and into central Los Angeles.
Green Convergence differentiates itself with an industry-leading 50-year warranty on labor and materials, far exceeding the standard 10 to 25 years offered by most competitors. On Yelp, the company holds a 4.7-star average across 222 reviews, with customers consistently praising the quality of equipment, professionalism of the install crews, and the company’s long-term commitment to customer satisfaction.
Service Area
Green Convergence serves the following areas within a 62-mile radius:
Contact Information
Are you Green Convergence?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
50 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
222 reviews
Tom W.
Best quality and best warranty in the business. Green Convergence installed Maxeon panels on our Valencia home and the system has been producing 15% above estimates. Their 50-year warranty sealed the deal.
Lisa P.
Very professional install by licensed roofers. As a SunPower dealer they offered premium panels at a competitive price. The whole process took about four weeks from contract to activation.
Mark S.
Solid company with knowledgeable staff. They took time to explain the difference between panel brands and helped us pick the right system size. Would recommend to anyone in the Santa Clarita Valley.
Frequently Asked Questions About Green Convergence
What services does Green Convergence offer?
Green Convergence offers Solar Installation, Battery Storage, Energy Audit, Solar Design, Monitoring, Roof Assessment.
Is Green Convergence NABCEP certified?
Yes, Green Convergence is NABCEP certified and also holds BBB Accredited, SunPower Master Dealer certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Green Convergence serve?
Green Convergence serves Los Angeles, Valencia, Santa Clarita, Palmdale, Lancaster, Burbank, Glendale, Simi Valley and 2 other areas. They are based in Los Angeles with a service radius of 100 km.
What warranty does Green Convergence offer?
Green Convergence offers 25-year panel warranty, 25-year inverter warranty, and 50-year installation/workmanship warranty.
How are Green Convergence's customer reviews?
Green Convergence has a 4.7/5 rating based on 222 customer reviews. Customers consistently rate them highly.
How long has Green Convergence been in business?
Green Convergence was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Los Angeles
Get a Free Solar Quote from Green Convergence
Fill in your details and we'll connect you with Green Convergence.
Quote request sent!
Green Convergence will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile