Green Flare
Award-winning renewable energy specialists covering Bristol and the South West since 2009
17+
Years in Business
87
Customer Reviews
60 km
Service Area
SurgePV Score
About Green Flare
Green Flare is an award-winning renewable energy company based at 200 South Liberty Lane, Bedminster, Bristol BS3 2TY. Founded in 2009, the company has over 15 years of experience designing and installing solar PV systems, battery storage, heat pumps, and underfloor heating for homes and commercial properties across Bristol, Bath, Clevedon, and the wider South West.
The company holds MCS accreditation (since 2010), NICEIC approval, and RECC membership, alongside ISO 9001 and ISO 14001 certifications for quality and environmental management. Green Flare offers solar panels with 20-25 year performance guarantees, inverters with 5-12 year manufacturer warranties, and a workmanship guarantee of up to 10 years on all installations.
On Google, Green Flare holds a 4.8-star rating from 87 reviews. Customers regularly praise the company’s professionalism, high-quality workmanship, and willingness to accommodate specific installation requirements. The company has also earned positive reviews from customers who switched to Green Flare after unsatisfactory experiences with other installers, highlighting the team’s ability to resolve issues left by previous contractors.
Service Area
Green Flare serves the following areas within a 60 km radius:
Contact Information
Are you Green Flare?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.8
87 reviews
Verified Customer
Excellent service from design to installation. Matt, Ash and the team were great at working with the time and space constraints of the project.
Verified Customer
From the initial quote, to the follow up information, right through to the installation team — all were professional and polite and did a great job.
Verified Customer
Very happy with the solar panel system and would highly recommend Green Flare to anyone looking for a PV install. So far the system is out performing the original estimates so could not be happier.
Frequently Asked Questions About Green Flare
What services does Green Flare offer?
Green Flare offers Solar Installation, Battery Storage, Maintenance.
Is Green Flare MCS certified?
Yes, Green Flare is MCS certified and also holds NICEIC, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Green Flare serve?
Green Flare serves Bristol, Bath, Clevedon, North Somerset. They are based in Bristol with a service radius of 60 km.
What warranty does Green Flare offer?
Green Flare offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Green Flare's customer reviews?
Green Flare has a 4.8/5 rating based on 87 customer reviews. Customers consistently rate them highly.
How long has Green Flare been in business?
Green Flare was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Bristol
Get a Free Solar Quote from Green Flare
Fill in your details and we'll connect you with Green Flare.
Quote request sent!
Green Flare will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile