Green Rack Solar
Pittsburgh solar installer with more manufacturer certifications than almost any competitor, including Tesla, Enphase Platinum, and Q.CELLS Q.Partner
7+
Years in Business
50
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Green Rack Solar
Green Rack Solar is a Pittsburgh-based solar installation company founded in 2019 that has quickly established itself as one of the most highly certified installers in Western Pennsylvania. Headquartered at 1418 Parkway View Drive in Pittsburgh, Green Rack holds more manufacturer certifications than almost any other installer in the region, including Tesla Powerwall Certified, Enphase Platinum, Q.CELLS Q.Partner, REC ProTrust, Span Certified, and Savant Certified.
The company installs Q.CELLS and REC solar panels alongside Enphase microinverters and Tesla Powerwall battery storage. Green Rack serves both residential and commercial customers in the greater Pittsburgh and Columbus, Ohio areas, and has installed thousands of solar arrays across those markets. The company is known for improving initial panel layouts to maximize energy output and aesthetic appeal.
Green Rack Solar maintains a 4.9-star rating across review platforms, with customers consistently praising the professionalism and efficiency of their installation crews. The company offers full-service solar solutions from initial consultation and system design through permitting, installation, and post-activation monitoring.
Service Area
Green Rack Solar serves the following areas within a 75-mile radius:
Contact Information
Are you Green Rack Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
50 reviews
Chris M.
Green Rack improved our initial panel layout and the final system produces significantly more energy than we expected. Crew leaders Alex and Zack were professional and efficient throughout the install.
Diane W.
We got the exact solar panels and micro-inverters we wanted. Green Rack helped us design a larger system than other companies proposed, and the aesthetics on our roof look fantastic.
Tom P.
From the initial consultation through installation and activation, Green Rack was transparent and communicative. The crew handled a difficult roof angle with skill and the system is exceeding production estimates.
Frequently Asked Questions About Green Rack Solar
What services does Green Rack Solar offer?
Green Rack Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Roof Assessment, Grid Connection, Maintenance.
Is Green Rack Solar NABCEP certified?
Green Rack Solar holds the following certifications: Tesla Powerwall Certified, Enphase Platinum, Q.CELLS Q.Partner, REC ProTrust, Span Certified, Savant Certified. Contact them directly for the latest accreditation details.
What areas does Green Rack Solar serve?
Green Rack Solar serves Pittsburgh, Columbus, Cranberry Township, Wexford, Washington, Canonsburg. They are based in Pittsburgh with a service radius of 120 km.
What warranty does Green Rack Solar offer?
Green Rack Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Green Rack Solar's customer reviews?
Green Rack Solar has a 4.9/5 rating based on 50 customer reviews. Customers consistently rate them highly.
How long has Green Rack Solar been in business?
Green Rack Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Pittsburgh
Get a Free Solar Quote from Green Rack Solar
Fill in your details and we'll connect you with Green Rack Solar.
Quote request sent!
Green Rack Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile