Green Street Solar
Local solar installer specializing in residential and small commercial grid-tied PV systems across Maryland and Delaware
11+
Years in Business
15
Customer Reviews
75 mi
Service Area
2-10
Employees
SurgePV Score
About Green Street Solar
Green Street Solar is a solar installation company with a Baltimore, Maryland office at PO Box 26225, Baltimore, MD 21212, specializing in grid-tied solar electric systems for houses and small businesses across Maryland and Delaware. The company focuses exclusively on residential and small commercial photovoltaic installations, bringing a specialized expertise rather than a generalist approach. Green Street Solar handles system design, procurement, installation, permitting, and utility interconnection for each project.
The company offers a 10-year workmanship warranty on all installations and works with customers to size systems accurately based on actual energy usage data. Green Street Solar’s focused approach means the team can provide detailed attention to each project without the overhead and complexity of a larger operation. The company assists with net metering applications and coordinates with local utilities for system interconnection.
Green Street Solar maintains positive customer reviews with clients praising the company’s honest approach, accurate system sizing, and quality installation work. The company’s smaller size allows for direct communication with the project team throughout the installation process, and customers appreciate the straightforward pricing without pressure to add unnecessary equipment or services.
Service Area
Green Street Solar serves the following areas within a 75-mile radius:
Contact Information
Are you Green Street Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
15 reviews
Helen S.
Green Street Solar installed a grid-tied system on our home and handled all the permitting and utility paperwork. The team was knowledgeable and the installation was clean. System has been producing well since day one.
Mark D.
Small company that focuses on what they do best: residential solar. They did not try to upsell unnecessary add-ons. The system was sized correctly for our usage and the 10-year workmanship warranty is solid.
Frequently Asked Questions About Green Street Solar
What services does Green Street Solar offer?
Green Street Solar offers Solar Installation, Solar Design, Maintenance, Grid Connection.
Is Green Street Solar NABCEP certified?
Green Street Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Green Street Solar serve?
Green Street Solar serves Baltimore, Towson, Columbia, Annapolis, Easton, Salisbury. They are based in Baltimore with a service radius of 120 km.
What warranty does Green Street Solar offer?
Green Street Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Green Street Solar's customer reviews?
Green Street Solar has a 4.6/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has Green Street Solar been in business?
Green Street Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Baltimore
Get a Free Solar Quote from Green Street Solar
Fill in your details and we'll connect you with Green Street Solar.
Quote request sent!
Green Street Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile