Greenstar Power
Women-owned and veteran-operated Texas solar company serving Austin and beyond since 2017
9+
Years in Business
38
Customer Reviews
99 mi
Service Area
11-50
Employees
SurgePV Score
About Greenstar Power
Greenstar Power is a locally owned and operated solar energy company founded in 2017 and headquartered in Round Rock, Texas, just north of Austin. The company is women-owned and veteran-operated, bringing a service-first mentality to residential and commercial solar installations across the state. From its Round Rock headquarters at 1000 Gattis School Road, Greenstar Power has expanded to serve customers throughout Texas, including the Austin, San Antonio, Dallas, and Houston metro areas.
The company provides comprehensive solar services including energy consultations, system design, installation, battery storage, and roof assessments. Greenstar Power installs panels from Qcells, Silfab, and Canadian Solar alongside Enphase microinverters and SolarEdge string inverters. Battery storage options include Tesla Powerwall and Enphase IQ Battery for homeowners seeking energy independence and backup power.
Greenstar Power holds a 4.7-star rating on EcoWatch and is BBB-accredited. The company has earned positive reviews from customers who praise the thoroughness of the energy consultation process and the professionalism of the installation crews. Greenstar Power also offers financing assistance and helps customers navigate available incentives, including the federal Investment Tax Credit and local utility rebates from Austin Energy.
Service Area
Greenstar Power serves the following areas within a 99-mile radius:
Contact Information
Are you Greenstar Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
38 reviews
Laura P.
Greenstar Power made going solar easy. From the initial energy consultation to the final walkthrough, every step was clearly communicated. Our system was installed in one day and has been producing above estimate.
Nathan K.
We chose Greenstar because they are a local, veteran-operated company. The quality of the installation was top-notch and the crew was respectful and thorough. Our electric bill is now nearly zero.
Priya S.
Good experience with Greenstar Power. The system design was well thought out and the installation went smoothly. Communication could have been slightly better during the permitting phase, but overall a solid company.
Frequently Asked Questions About Greenstar Power
What services does Greenstar Power offer?
Greenstar Power offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Roof Assessment, Maintenance, Commercial Solar, Grid Connection.
Is Greenstar Power NABCEP certified?
Yes, Greenstar Power is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Greenstar Power serve?
Greenstar Power serves Austin, Round Rock, Georgetown, Cedar Park, Pflugerville, San Antonio, Dallas, Houston and 2 other areas. They are based in Austin with a service radius of 160 km.
What warranty does Greenstar Power offer?
Greenstar Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Greenstar Power's customer reviews?
Greenstar Power has a 4.7/5 rating based on 38 customer reviews. Customers consistently rate them highly.
How long has Greenstar Power been in business?
Greenstar Power was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.
Similar Installers in Austin
Get a Free Solar Quote from Greenstar Power
Fill in your details and we'll connect you with Greenstar Power.
Quote request sent!
Greenstar Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile