HS

Harvest Solar Energy

Family-run Tulsa solar specialist with over 20 years of solar and wind power experience

Tulsa, Oklahoma
4.8 (15 reviews)
Residential Commercial off-grid

24+

Years in Business

0

15

Customer Reviews

75 mi

Service Area

1-10

Employees

SurgePV Score

7.3 / 10
Customer Reviews
96%
Certifications
0%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About Harvest Solar Energy

Harvest Solar Energy is a family-run solar installation company based at 4413 E 47th St, Tulsa, OK 74135. Founded in 2002, the company has over 20 years of solar and wind power experience, making it one of the longest-operating solar specialists in the Tulsa metro area.

Harvest Solar Energy provides grid-tied, off-grid, and battery backup solar systems for residential and commercial clients. Their services extend beyond standard solar PV to include solar thermal systems, wind energy, energy management systems, energy auditing, solar pool heating, solar lighting, skylights, and solar attic fans. The company serves Oklahoma, Texas, Arkansas, and Missouri.

The small, dedicated team at Harvest Solar is known for hands-on customer service and custom-designed solutions tailored to each property. They offer free site assessments and work with clients to maximize energy production and return on investment.

Service Area

Harvest Solar Energy serves the following areas within a 75-mile radius:

TulsaBroken ArrowBixbyOwassoJenks

Are you Harvest Solar Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Energy Audit

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

15 reviews

Verified Customer

10 September 2025
Verified Customer

Harvest Solar provided a thorough consultation and designed a system that fit our home perfectly. The family-run feel of the company gave us confidence throughout the process.

Verified Customer

15 June 2025
Verified Customer

With over two decades of experience, these folks know solar inside and out. Installation was smooth and the system has been producing exactly as projected.

Verified Customer

22 March 2025
Verified Customer

Good experience overall. The team was knowledgeable about both grid-tied and off-grid options. Took a bit longer than expected but the final result was worth the wait.

Frequently Asked Questions About Harvest Solar Energy

What services does Harvest Solar Energy offer?

Harvest Solar Energy offers Solar Installation, Battery Storage, Maintenance, Energy Audit.

Is Harvest Solar Energy NABCEP certified?

Harvest Solar Energy holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Harvest Solar Energy serve?

Harvest Solar Energy serves Tulsa, Broken Arrow, Bixby, Owasso, Jenks. They are based in Tulsa with a service radius of 120 km.

What warranty does Harvest Solar Energy offer?

Harvest Solar Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Harvest Solar Energy's customer reviews?

Harvest Solar Energy has a 4.8/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has Harvest Solar Energy been in business?

Harvest Solar Energy was founded in 2002 and has been in business for 24 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Harvest Solar Energy

Fill in your details and we'll connect you with Harvest Solar Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote