Okie Solar
NABCEP-certified Oklahoma City solar installer with 300+ Google reviews and BBB A+ rating
14+
Years in Business
300
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About Okie Solar
Okie Solar is a locally owned, family-operated solar installation company headquartered at 2616 S Ann Arbor Ave, Oklahoma City, OK 73128. Founded in 2012 and relocated to Oklahoma City in 2016, the company expanded to Tulsa in 2019 and has become the most recommended solar company in Oklahoma, with over 300 Google reviews at a 4.9-star rating.
Okie Solar holds NABCEP certification and BBB A+ accreditation, along with certified installer status from Enphase, SolarEdge, AP Systems, Sol-Ark, Generac, Fortress, and EG4. The company is also an Axitec Premiere Partner. This broad range of certifications allows Okie Solar to design and install systems using the equipment best suited to each customer’s needs and budget.
The company serves residential and commercial clients throughout Oklahoma, including Oklahoma City, Edmond, Norman, Moore, and Tulsa. Okie Solar provides free consultations and handles the complete solar installation process from system design through permitting, installation, and utility interconnection. The company has earned multiple awards from the BBB, the American Solar Energy Society, and the Greater Oklahoma City Chamber.
Service Area
Okie Solar serves the following areas within a 75-mile radius:
Contact Information
Are you Okie Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
300 reviews
Verified Customer
Okie Solar exceeded our expectations in every way. The team was professional, knowledgeable, and our system is producing more energy than projected. Best decision we made for our home.
Verified Customer
Locally owned and it shows. Okie Solar took the time to explain every option and designed a system that perfectly matches our energy usage. Installation was clean and fast.
Verified Customer
Outstanding customer service from start to finish. The NABCEP certification gives real confidence in their work. Already recommending Okie Solar to our neighbors.
Frequently Asked Questions About Okie Solar
What services does Okie Solar offer?
Okie Solar offers Solar Installation, Battery Storage.
Is Okie Solar NABCEP certified?
Okie Solar holds the following certifications: NABCEP Certified, BBB A+, Enphase Certified Installer, SolarEdge Certified Installer, Sol-Ark Certified Installer, Generac Certified Installer. Contact them directly for the latest accreditation details.
What areas does Okie Solar serve?
Okie Solar serves Oklahoma City, Edmond, Norman, Moore, Tulsa, Midwest City. They are based in Oklahoma City with a service radius of 120 km.
What warranty does Okie Solar offer?
Okie Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Okie Solar's customer reviews?
Okie Solar has a 4.9/5 rating based on 300 customer reviews. Customers consistently rate them highly.
How long has Okie Solar been in business?
Okie Solar was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.
Similar Installers in Oklahoma City
Get a Free Solar Quote from Okie Solar
Fill in your details and we'll connect you with Okie Solar.
Quote request sent!
Okie Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile