Sage Solar Oklahoma
Locally owned Oklahoma City solar installer established in 2002 with NABCEP certification and A+ BBB rating
24+
Years in Business
25
Customer Reviews
62 mi
Service Area
2-10
Employees
SurgePV Score
About Sage Solar Oklahoma
Sage Solar Oklahoma is a locally owned solar installation company established in 2002 and headquartered at 2101 NW 59th Pl, Oklahoma City, OK 73112. The company is owned and operated by Chris and Ctaci Gary and specializes in grid-tied solar power systems for residential and commercial properties throughout Oklahoma.
Sage Solar holds NABCEP certification and maintains a BBB A+ rating. A key differentiator is the company’s commitment to using no subcontractors, with all installations performed by their own trained crew. This approach ensures consistent quality control and direct accountability on every project. The company offers 25-year warranties on installations.
With over 20 years in the Oklahoma solar market, Sage Solar has built a strong local reputation for honest pricing, quality workmanship, and responsive customer service. Customers consistently highlight the competitive pricing, with presentations often thousands less than larger national competitors, and the personal attention that comes from working with a locally owned business.
Service Area
Sage Solar Oklahoma serves the following areas within a 62-mile radius:
Contact Information
Are you Sage Solar Oklahoma?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
25 reviews
Verified Customer
Sage Solar provided an honest and upfront presentation with pricing thousands less than competitors. Chris and Ctaci were great to work with throughout the entire process.
Verified Customer
Excellent solar installation from a truly local company. No subcontractors were used and the quality of work was outstanding. The system is performing above expectations.
Verified Customer
Chose Sage Solar for their experience and local reputation. The installation was completed professionally and on schedule. Very satisfied with the results.
Frequently Asked Questions About Sage Solar Oklahoma
What services does Sage Solar Oklahoma offer?
Sage Solar Oklahoma offers Solar Installation.
Is Sage Solar Oklahoma NABCEP certified?
Sage Solar Oklahoma holds the following certifications: NABCEP Certified, BBB A+. Contact them directly for the latest accreditation details.
What areas does Sage Solar Oklahoma serve?
Sage Solar Oklahoma serves Oklahoma City, Edmond, Norman, Moore, Yukon, Mustang. They are based in Oklahoma City with a service radius of 100 km.
What warranty does Sage Solar Oklahoma offer?
Sage Solar Oklahoma offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are Sage Solar Oklahoma's customer reviews?
Sage Solar Oklahoma has a 5/5 rating based on 25 customer reviews. Customers consistently rate them highly.
How long has Sage Solar Oklahoma been in business?
Sage Solar Oklahoma was founded in 2002 and has been in business for 24 years. They are one of the more experienced solar installers in their area.
Similar Installers in Oklahoma City
Get a Free Solar Quote from Sage Solar Oklahoma
Fill in your details and we'll connect you with Sage Solar Oklahoma.
Quote request sent!
Sage Solar Oklahoma will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile