RO

REPOWER OC

Family-owned Orange County solar installer providing affordable, clean energy solutions with 5-star service

Long Beach, California
5 (20 reviews)
Verified
Residential Commercial

11+

Years in Business

0

20

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

7.4 / 10
Customer Reviews
100%
Certifications
60%
Experience
85%
Services Range
60%
Warranty Coverage
63%
Online Presence
50%

About REPOWER OC

REPOWER OC is a family-owned solar installation company based at 2942 Century Place, Suite 760, in Costa Mesa, California, serving Long Beach and the greater Orange County and Los Angeles County regions. The company is dedicated to providing affordable, clean, and aesthetically aligned solar energy solutions for residential and commercial properties.

REPOWER OC handles complete solar installations including system design, financing assistance, permitting, and installation. The company holds a California C-46 Solar Contractor license and focuses on delivering personalized service to each customer throughout the installation process.

The company has earned a 5.0-star rating on EcoWatch as an Outstanding Local Installer and is known for reliable customer support and prompt service delivery across Orange County and surrounding areas.

Service Area

REPOWER OC serves the following areas within a 50-mile radius:

Long BeachCosta MesaIrvineHuntington BeachAnaheimSanta Ana

Are you REPOWER OC?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design

Certifications & Accreditations

C-46 Solar Contractor License

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

20 reviews

Jessica L.

28 July 2025
Verified Customer

REPOWER OC provided outstanding service from start to finish. As a family-owned company, they really take the time to understand your needs and design the right system.

Andrew K.

15 April 2025
Verified Customer

Great local company that delivers on their promises. The installation was professional and aesthetically pleasing. Our energy bills have dropped dramatically.

Diana M.

20 January 2025
Verified Customer

Chose REPOWER for their local reputation and family-owned approach. They handled everything including financing options and city permits. Very satisfied.

Frequently Asked Questions About REPOWER OC

What services does REPOWER OC offer?

REPOWER OC offers Solar Installation, Solar Design.

Is REPOWER OC NABCEP certified?

REPOWER OC holds the following certifications: C-46 Solar Contractor License. Contact them directly for the latest accreditation details.

What areas does REPOWER OC serve?

REPOWER OC serves Long Beach, Costa Mesa, Irvine, Huntington Beach, Anaheim, Santa Ana. They are based in Long Beach with a service radius of 80 km.

What warranty does REPOWER OC offer?

REPOWER OC offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are REPOWER OC's customer reviews?

REPOWER OC has a 5/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has REPOWER OC been in business?

REPOWER OC was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from REPOWER OC

Fill in your details and we'll connect you with REPOWER OC.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote