Solar Source
Family-operated Long Beach solar installer since 2008 using American-made equipment with 5-star rating
18+
Years in Business
49
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Solar Source
Solar Source is a family-operated solar installation company located at 2954 E 14th Street in Long Beach, California. Founded in 2008, the company has been serving residential and commercial customers across Long Beach and the greater Southern California region for over 15 years, using American-made solar equipment.
Solar Source provides complete solar installation services including system design, permitting, installation, and utility interconnection. The company holds a California C-46 Solar Contractor license and maintains BBB accreditation. They offer financing assistance and permit handling for all residential and commercial projects.
The company has earned a 5.0-star rating on EcoWatch with 49 reviews on Yelp, and operates Monday through Saturday, 8:00 AM to 5:00 PM.
Service Area
Solar Source serves the following areas within a 50-mile radius:
Contact Information
Are you Solar Source?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
49 reviews
Mark S.
Solar Source is a true local company that cares about their customers. Being family-operated shows in the quality of their work. Our system has been flawless since installation.
Lisa N.
We chose Solar Source for their use of American-made equipment and local reputation. The installation was clean, professional, and completed on schedule.
Tony G.
Excellent family-run business. They handled all the permitting with the city of Long Beach and our utility interconnection. System has been producing above estimates.
Frequently Asked Questions About Solar Source
What services does Solar Source offer?
Solar Source offers Solar Installation, Solar Design, Grid Connection.
Is Solar Source NABCEP certified?
Solar Source holds the following certifications: C-46 Solar Contractor License, BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Solar Source serve?
Solar Source serves Long Beach, Lakewood, Signal Hill, Seal Beach, Carson, Torrance. They are based in Long Beach with a service radius of 80 km.
What warranty does Solar Source offer?
Solar Source offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solar Source's customer reviews?
Solar Source has a 5/5 rating based on 49 customer reviews. Customers consistently rate them highly.
How long has Solar Source been in business?
Solar Source was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Long Beach
Get a Free Solar Quote from Solar Source
Fill in your details and we'll connect you with Solar Source.
Quote request sent!
Solar Source will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile