IS

Icon Solar

Ohio's longest-operating local solar installer serving the Tristate since 2009

Cincinnati, Ohio
4.8 (45 reviews)
Verified
Residential Commercial

17+

Years in Business

0

45

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

9.3 / 10
Customer Reviews
96%
Certifications
90%
Experience
100%
Services Range
75%
Warranty Coverage
100%
Online Presence
100%

About Icon Solar

Icon Solar is one of the largest residential solar installers in Ohio, Kentucky, and Indiana, headquartered at 50 West Technecenter Drive, Suite K, Milford, OH 45150. Founded in 2009, Icon Solar is the longest-operating local solar provider in the Tristate region.

The company is NABCEP certified, BBB A+ rated with zero complaints, and an authorized Tesla Powerwall installer. Icon Solar provides full-service turnkey installations for residential and commercial customers, including exclusive extended warranties and battery backup systems.

Icon Solar serves the Greater Cincinnati area as well as Dayton, Columbus, Northern Kentucky, and Southeast Indiana. The company offers financing options and handles all permitting and utility interconnection on behalf of customers.

Service Area

Icon Solar serves the following areas within a 75-mile radius:

CincinnatiMilfordDaytonColumbusNorthern KentuckySoutheast Indiana

Are you Icon Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

NABCEP Certified BBB A+ Tesla Powerwall Authorized Installer

Partner Manufacturers

Panels

RECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

45 reviews

Verified Customer

12 September 2025
Verified Customer

Icon Solar handled everything from design through installation. Their team was professional and the system has been performing above projections since day one.

Verified Customer

18 June 2025
Verified Customer

As one of the oldest solar companies in Ohio, their experience really shows. The entire process was smooth and well-organized. Highly recommend.

Verified Customer

5 March 2025
Verified Customer

Great experience from start to finish. The financing options made it easy and the installation crew was fast and clean. System is generating exactly as promised.

Frequently Asked Questions About Icon Solar

What services does Icon Solar offer?

Icon Solar offers Solar Installation, Battery Storage, EV Charging.

Is Icon Solar NABCEP certified?

Icon Solar holds the following certifications: NABCEP Certified, BBB A+, Tesla Powerwall Authorized Installer. Contact them directly for the latest accreditation details.

What areas does Icon Solar serve?

Icon Solar serves Cincinnati, Milford, Dayton, Columbus, Northern Kentucky, Southeast Indiana. They are based in Cincinnati with a service radius of 120 km.

What warranty does Icon Solar offer?

Icon Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are Icon Solar's customer reviews?

Icon Solar has a 4.8/5 rating based on 45 customer reviews. Customers consistently rate them highly.

How long has Icon Solar been in business?

Icon Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Icon Solar

Fill in your details and we'll connect you with Icon Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote