IS

Infinity Solar

Orange County's premier Tesla certified solar installer with 287+ reviews and battery storage expertise

Anaheim, California
4.7 (287 reviews)
Verified
Residential

27+

Years in Business

0

287

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8.3 / 10
Customer Reviews
94%
Certifications
60%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Infinity Solar

Infinity Solar is Orange County’s premier solar installation company located at 749 N Main Street in Orange, California, serving Anaheim and the greater Orange County region. The company is a Tesla Certified installer offering solar panels, Tesla Powerwall battery storage, and EV charging station installations.

Infinity Solar provides residential solar installations with advanced battery systems, helping homeowners achieve energy independence. As a Tesla Certified installer, the company specializes in integrating Tesla solar panels, Powerwall batteries, and EV chargers into comprehensive home energy systems.

The company has earned a 4.7-star rating with 287 reviews on Yelp, making it one of the most-reviewed solar companies in Orange County. Infinity Solar serves Anaheim, Orange, Fullerton, Placentia, Yorba Linda, Brea, and surrounding communities.

Service Area

Infinity Solar serves the following areas within a 50-mile radius:

AnaheimOrangeFullertonPlacentiaYorba LindaBrea

Are you Infinity Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Solar Design

Certifications & Accreditations

Tesla Certified Installer

Partner Manufacturers

Panels

Tesla

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

287 reviews

Michelle T.

18 August 2025
Verified Customer

Infinity Solar installed Tesla solar panels and a Powerwall on our Anaheim home. The Tesla Certified team knew exactly what they were doing. System has been flawless.

Steven R.

25 May 2025
Verified Customer

We added EV charging along with our solar installation. Infinity handled everything professionally and the combined system saves us on electricity and fuel costs.

Karen L.

14 February 2025
Verified Customer

Great company with extensive experience in Orange County. The Tesla Powerwall gives us backup during outages and the solar panels have been producing above estimates.

Frequently Asked Questions About Infinity Solar

What services does Infinity Solar offer?

Infinity Solar offers Solar Installation, Battery Storage, EV Charging, Solar Design.

Is Infinity Solar NABCEP certified?

Infinity Solar holds the following certifications: Tesla Certified Installer. Contact them directly for the latest accreditation details.

What areas does Infinity Solar serve?

Infinity Solar serves Anaheim, Orange, Fullerton, Placentia, Yorba Linda, Brea. They are based in Anaheim with a service radius of 80 km.

What warranty does Infinity Solar offer?

Infinity Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Infinity Solar's customer reviews?

Infinity Solar has a 4.7/5 rating based on 287 customer reviews. Customers consistently rate them highly.

How long has Infinity Solar been in business?

Infinity Solar was founded in 1999 and has been in business for 27 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Infinity Solar

Fill in your details and we'll connect you with Infinity Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote