Infinium Solar Roofing and Electric
SunPower Certified Dealer serving the San Jose area since 2008, with 101+ reviews and 17 years of solar industry experience
18+
Years in Business
101
Customer Reviews
37 mi
Service Area
11-50
Employees
SurgePV Score
About Infinium Solar Roofing and Electric
Infinium Solar Roofing and Electric is a SunPower Certified Dealer based at 1190 Dell Avenue, Suite O, in Campbell, California, serving San Jose and the greater South Bay since 2008. Led by CEO Jeff Long, the company has over 17 years of solar industry experience and specializes in residential solar panel installations, roofing, and electrical services. Infinium Solar is fully licensed in California under CSLB #1031953 and carries comprehensive insurance for all roofing and solar projects.
The company is one of the few solar firms in California that stocks and supplies its own products, giving customers direct access to premium SunPower equipment at competitive prices. Infinium installs SunPower panels alongside Enphase microinverters, and offers combined roofing-plus-solar packages for homeowners who need both services. The company handles every step of the process, from initial assessment and design through permitting, installation, and final inspection.
Infinium Solar serves Campbell, San Jose, Los Gatos, Saratoga, Santa Clara, Sunnyvale, Cupertino, and Mountain View. With 101 reviews on Yelp and a 4.8-star average, the company has earned a strong reputation for quality work and responsive customer service in the San Jose metro area.
Service Area
Infinium Solar Roofing and Electric serves the following areas within a 37-mile radius:
Contact Information
Are you Infinium Solar Roofing and Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
101 reviews
Sandra B.
Infinium Solar replaced our old roof and installed solar panels in a single project. Jeff and his team were professional throughout. The SunPower panels look great and are producing more than expected.
Paul V.
Outstanding service from start to finish. Infinium offered competitive pricing for premium SunPower equipment. The installation crew was efficient and left everything clean.
Amy T.
Good experience overall. The team was responsive to questions and the system design was well thought out for our roof layout. Took a bit longer than expected for permitting but that was the city's fault.
Frequently Asked Questions About Infinium Solar Roofing and Electric
What services does Infinium Solar Roofing and Electric offer?
Infinium Solar Roofing and Electric offers Solar Installation, Battery Storage, Solar Design, Roof Assessment, Maintenance.
Is Infinium Solar Roofing and Electric NABCEP certified?
Infinium Solar Roofing and Electric holds the following certifications: SunPower Certified Dealer, CSLB Licensed. Contact them directly for the latest accreditation details.
What areas does Infinium Solar Roofing and Electric serve?
Infinium Solar Roofing and Electric serves San Jose, Campbell, Los Gatos, Saratoga, Santa Clara, Sunnyvale, Cupertino, Mountain View. They are based in San Jose with a service radius of 60 km.
What warranty does Infinium Solar Roofing and Electric offer?
Infinium Solar Roofing and Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Infinium Solar Roofing and Electric's customer reviews?
Infinium Solar Roofing and Electric has a 4.8/5 rating based on 101 customer reviews. Customers consistently rate them highly.
How long has Infinium Solar Roofing and Electric been in business?
Infinium Solar Roofing and Electric was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in San Jose
Get a Free Solar Quote from Infinium Solar Roofing and Electric
Fill in your details and we'll connect you with Infinium Solar Roofing and Electric.
Quote request sent!
Infinium Solar Roofing and Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile