Intermountain Wind & Solar
Leading Intermountain West solar company with NABCEP-certified installers, serving Idaho, Utah, Wyoming, and Oregon since 2008
18+
Years in Business
19
Customer Reviews
124 mi
Service Area
51-200
Employees
SurgePV Score
About Intermountain Wind & Solar
Intermountain Wind & Solar is one of the leading solar panel companies in the Intermountain West, serving Idaho, Utah, Wyoming, and Oregon from its Boise office at 1830 W Airport Way. Founded in 2008, the company is one of the few solar installers in the Boise area that handles the entire process from start to finish, including system design, engineering, permitting, installation, and post-installation service.
The company employs NABCEP-certified installers and holds contractor licenses in Idaho, Utah, Nevada, Wyoming, and Oregon. Intermountain Wind & Solar offers panels from Canadian Solar, Qcells, REC Group, Silfab, and SunPower alongside Enphase microinverters, SolarEdge optimizers, and Tesla Powerwall battery storage. The company is BBB-accredited since 2018.
Intermountain Wind & Solar maintains a 4.5-star rating from customer reviews, with homeowners praising the team’s responsiveness, quality of work, and expertise with local utility interconnection requirements. The company serves both residential and commercial customers and provides ongoing monitoring and maintenance support after installation.
Service Area
Intermountain Wind & Solar serves the following areas within a 124-mile radius:
Contact Information
Are you Intermountain Wind & Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
19 reviews
Tyler H.
Intermountain Wind & Solar handled everything from design to permitting to installation. Their team was responsive, professional, and knowledgeable about Idaho Power's interconnection requirements.
Rebecca N.
We appreciated that Intermountain handles the entire process in-house, from design to installation. The SunPower panels they installed are producing above estimates. Great customer service throughout.
Jason K.
Good experience with our residential installation. The team was professional and the system is performing well. The permitting process with the city took a bit longer than expected but Intermountain kept us updated.
Frequently Asked Questions About Intermountain Wind & Solar
What services does Intermountain Wind & Solar offer?
Intermountain Wind & Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Maintenance, Monitoring.
Is Intermountain Wind & Solar NABCEP certified?
Yes, Intermountain Wind & Solar is NABCEP certified and also holds BBB Accredited, Idaho Contractor License certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Intermountain Wind & Solar serve?
Intermountain Wind & Solar serves Boise, Meridian, Nampa, Eagle, Caldwell, McCall, Twin Falls. They are based in Boise with a service radius of 200 km.
What warranty does Intermountain Wind & Solar offer?
Intermountain Wind & Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Intermountain Wind & Solar's customer reviews?
Intermountain Wind & Solar has a 4.5/5 rating based on 19 customer reviews. Customers consistently rate them highly.
How long has Intermountain Wind & Solar been in business?
Intermountain Wind & Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Boise
Get a Free Solar Quote from Intermountain Wind & Solar
Fill in your details and we'll connect you with Intermountain Wind & Solar.
Quote request sent!
Intermountain Wind & Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile