JP

Jamar Power Systems

Family-owned San Diego electrical and solar contractor since 1984 with NABCEP-certified staff

San Diego, California
4.9 (200 reviews)
Verified
Residential Commercial

42+

Years in Business

0

200

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

9 / 10
Customer Reviews
98%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Jamar Power Systems

Jamar Power Systems is a family-owned electrical and solar contractor founded in 1984 by James and Margaret Halbert. Based at 9830 Prospect Ave, Suite D in Santee, the company provides residential and commercial solar installations, battery storage systems, and full-service electrical work throughout San Diego County. Jamar holds CA C-10 (electrical) and C-46 (solar) contractor licenses.

The company’s lead installer, Hal Halbert, is NABCEP Solar PV and Solar Thermal Certified and holds his own CA C-46 solar contractor’s license. Jamar Power Systems is BBB-accredited since 2009 with an A+ rating, and is a member of the Building Industry Association and Western Electrical Contractors Association. The company has accumulated over 200 five-star reviews across Google, Yelp, SolarReviews, and HomeAdvisor.

Jamar Power Systems takes a consultative approach, helping homeowners determine the right system size and configuration for their energy needs. The company handles all aspects of the installation process, from initial site assessment through design, permitting, installation, and final inspection. Business hours are Monday through Friday, 8am to 5pm.

Service Area

Jamar Power Systems serves the following areas within a 50-mile radius:

San DiegoSanteeEl CajonLa MesaLakesidePowayChula Vista

Are you Jamar Power Systems?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
electrical
Maintenance

Certifications & Accreditations

NABCEP BBB Accredited CSLB Licensed

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

200 reviews

Steve K.

28 September 2025
Verified Customer

Jamar did an excellent job on our solar installation. Hal is very knowledgeable and the crew was professional and efficient. Highly recommend.

Nancy D.

14 July 2025
Verified Customer

We used Jamar for both our electrical panel upgrade and solar installation. They handled everything seamlessly and the system is performing great.

Paul M.

22 April 2025
Verified Customer

Honest, professional, and fair pricing. Jamar has been in business for decades for good reason. They stand behind their work.

Frequently Asked Questions About Jamar Power Systems

What services does Jamar Power Systems offer?

Jamar Power Systems offers Solar Installation, Battery Storage, electrical, Maintenance.

Is Jamar Power Systems NABCEP certified?

Yes, Jamar Power Systems is NABCEP certified and also holds BBB Accredited, CSLB Licensed certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Jamar Power Systems serve?

Jamar Power Systems serves San Diego, Santee, El Cajon, La Mesa, Lakeside, Poway, Chula Vista. They are based in San Diego with a service radius of 80 km.

What warranty does Jamar Power Systems offer?

Jamar Power Systems offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Jamar Power Systems's customer reviews?

Jamar Power Systems has a 4.9/5 rating based on 200 customer reviews. Customers consistently rate them highly.

How long has Jamar Power Systems been in business?

Jamar Power Systems was founded in 1984 and has been in business for 42 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Jamar Power Systems

Fill in your details and we'll connect you with Jamar Power Systems.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote