JS

JC Solar

Family-owned Maryland solar installer partnered with Green Brilliance, serving Baltimore and the DMV with residential rooftop systems

Baltimore, Maryland
4.7 (20 reviews)
Verified
Residential

6+

Years in Business

0

20

Customer Reviews

75 mi

Service Area

2-10

Employees

SurgePV Score

7.9 / 10
Customer Reviews
94%
Certifications
60%
Experience
70%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About JC Solar

JC Solar is a family-owned solar installation company headquartered at 1661 Armistice Way in Marriottsville, Maryland, serving the Baltimore metropolitan area and the broader DMV region. The company has partnered with Green Brilliance, one of the largest installation companies in the DMV, giving JC Solar access to resources and expertise while maintaining its local, family-operated character. JC Solar provides residential solar panel installation alongside roofing services, allowing the company to assess and address roof conditions before solar panel placement.

The company handles the full installation process from initial roof assessment and system design through permitting and activation. JC Solar’s dual focus on roofing and solar means the team can identify and address potential roof issues that might affect a solar installation’s longevity or performance. This approach helps homeowners avoid the cost and disruption of removing panels for roof repairs later.

JC Solar maintains positive customer ratings with clients praising the company’s responsiveness, honest assessments, and quality of installation work. The company holds a Maryland contractor license and serves communities throughout Baltimore County, Howard County, Carroll County, and surrounding areas. As a smaller local operator, JC Solar offers direct communication with the project lead throughout the installation process.

Service Area

JC Solar serves the following areas within a 75-mile radius:

BaltimoreMarriottsvilleEllicott CityColumbiaTowsonCatonsvilleWestminster

Are you JC Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Roof Assessment
Maintenance

Certifications & Accreditations

Licensed Contractor (MD)

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

20 reviews

Patricia G.

30 August 2025
Verified Customer

JC Solar installed our system quickly and professionally. Eric was responsive to our questions and kept us informed throughout the process. The panels are producing as expected and our electric bill has dropped considerably.

Daniel R.

20 May 2025
Verified Customer

Small family-owned company that delivers quality work. They assessed our roof condition first and recommended some repairs before the solar installation. Appreciated the honesty and attention to detail.

Susan W.

15 February 2025
Verified Customer

Good local option for solar. The team was friendly and the installation went smoothly. Pricing was competitive with larger companies. Would recommend to friends and family in the area.

Frequently Asked Questions About JC Solar

What services does JC Solar offer?

JC Solar offers Solar Installation, Solar Design, Roof Assessment, Maintenance.

Is JC Solar NABCEP certified?

JC Solar holds the following certifications: Licensed Contractor (MD). Contact them directly for the latest accreditation details.

What areas does JC Solar serve?

JC Solar serves Baltimore, Marriottsville, Ellicott City, Columbia, Towson, Catonsville, Westminster. They are based in Baltimore with a service radius of 120 km.

What warranty does JC Solar offer?

JC Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are JC Solar's customer reviews?

JC Solar has a 4.7/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has JC Solar been in business?

JC Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from JC Solar

Fill in your details and we'll connect you with JC Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote