JS

JEH Solar

Louisiana solar and electrical contractor serving Baton Rouge with off-grid systems, installations, and maintenance

Baton Rouge, Louisiana
4.7 (12 reviews)
Verified
Residential Commercial off-grid

2026+

Years in Business

0

12

Customer Reviews

75 mi

Service Area

1-10

Employees

SurgePV Score

8.3 / 10
Customer Reviews
94%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
50%

About JEH Solar

JEH Solar LLC is a Louisiana solar installation and electrical contractor with offices in Lafayette (105 Henderson Rd, Lafayette, LA 70508) and a dedicated Baton Rouge service area. The company provides solar panel installations, generator hookups, off-grid solar systems, and electrical services to residential and commercial clients across Louisiana.

JEH Solar holds a BBB A+ rating and serves clients in Baton Rouge, Lafayette, New Orleans, Shreveport, and Lake Charles. Their services include new solar installations, solar system cleaning and maintenance, repairs, and off-grid system design for both residential and commercial properties.

Service Area

JEH Solar serves the following areas within a 75-mile radius:

Baton RougeLafayetteNew OrleansShreveportLake Charles

Are you JEH Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

BBB A+ Rated Louisiana Licensed Contractor

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

No reviews yet.

Frequently Asked Questions About JEH Solar

What services does JEH Solar offer?

JEH Solar offers Solar Installation, Battery Storage, Maintenance.

Is JEH Solar NABCEP certified?

JEH Solar holds the following certifications: BBB A+ Rated, Louisiana Licensed Contractor. Contact them directly for the latest accreditation details.

What areas does JEH Solar serve?

JEH Solar serves Baton Rouge, Lafayette, New Orleans, Shreveport, Lake Charles. They are based in Baton Rouge with a service radius of 120 km.

What warranty does JEH Solar offer?

JEH Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are JEH Solar's customer reviews?

JEH Solar has a 4.7/5 rating based on 12 customer reviews. Customers consistently rate them highly.

How long has JEH Solar been in business?

JEH Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from JEH Solar

Fill in your details and we'll connect you with JEH Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote