JS

Johnson Solar

Veteran-owned solar and battery installer in San Diego with competitive pricing and fast installation

San Diego, California
4.8 (71 reviews)
Verified
Residential Commercial

11+

Years in Business

0

71

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

8 / 10
Customer Reviews
96%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
63%
Online Presence
75%

About Johnson Solar

Johnson Solar is a military veteran-owned solar installation company based in El Cajon, San Diego County. Founded in 2015 by retired Navy Aviator Clinton Johnson, the company is located at 2514 Jamacha Road, Suite 502, and provides residential and commercial solar installations, battery storage, electrical panel upgrades, EV chargers, and sub panels throughout San Diego County.

The company installs equipment from leading manufacturers including Qcells and Panasonic panels, Enphase and SolarEdge inverters, and battery systems from LG Chem, Generac, and Enphase. Johnson Solar is CSLB licensed and specializes in turnkey solar solutions, handling every step from design and permitting through installation and interconnection.

On Yelp, Johnson Solar holds a 4.8-star rating from 71 reviews. Customers consistently praise the company’s competitive pricing, responsive communication, and fast installation timelines. Clinton Johnson is directly involved in each project and is available to answer customer questions throughout the process.

Service Area

Johnson Solar serves the following areas within a 50-mile radius:

San DiegoEl CajonChula VistaAlpineJamulOceansideRamona

Are you Johnson Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
electrical
EV Charging

Certifications & Accreditations

CSLB Licensed

Partner Manufacturers

Panels

QcellsPanasonic

Inverters

EnphaseSolarEdge

Batteries

LG ChemGeneracEnphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

71 reviews

Carlos M.

20 October 2025
Verified Customer

Clinton and his team at Johnson Solar were fantastic. Great price, quality equipment, and the installation was done in one day. Highly recommend.

Sarah J.

30 July 2025
Verified Customer

We got quotes from several companies and Johnson Solar offered the best value. The owner Clinton was responsive to all our questions and the crew was professional.

Mike T.

12 May 2025
Verified Customer

Excellent experience from start to finish. Veteran-owned business that takes pride in their work. Our system is producing exactly as promised.

Frequently Asked Questions About Johnson Solar

What services does Johnson Solar offer?

Johnson Solar offers Solar Installation, Battery Storage, electrical, EV Charging.

Is Johnson Solar NABCEP certified?

Johnson Solar holds the following certifications: CSLB Licensed. Contact them directly for the latest accreditation details.

What areas does Johnson Solar serve?

Johnson Solar serves San Diego, El Cajon, Chula Vista, Alpine, Jamul, Oceanside, Ramona. They are based in San Diego with a service radius of 80 km.

What warranty does Johnson Solar offer?

Johnson Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Johnson Solar's customer reviews?

Johnson Solar has a 4.8/5 rating based on 71 customer reviews. Customers consistently rate them highly.

How long has Johnson Solar been in business?

Johnson Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Johnson Solar

Fill in your details and we'll connect you with Johnson Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote