LL

Lectec Ltd

MCS-accredited solar, battery and EV charger installer with 25+ years of electrical expertise

Colchester, UK
0 (0 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

60 km

Service Area

1-10

Employees

SurgePV Score

6.3 / 10
Customer Reviews
0%
Certifications
90%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
50%

About Lectec Ltd

Lectec Ltd is an MCS-accredited solar PV, battery storage, and EV charger installer with over 25 years of industry experience. The company is registered at 8 Pyes Close, Walsham-Le-Willows, Bury St Edmunds, Suffolk IP31 3FW and serves Colchester, Suffolk, Norfolk, Cambridgeshire, and Essex. Lectec can be contacted by phone on 01359 342538 or by email at [email protected].

The company holds MCS accreditation for both solar PV and battery storage installations, is registered with NAPIT as a Competent Persons Scheme member, and is RECC accredited. Lectec’s MCS certification enables customers to register for Smart Export Guarantee (SEG) payments for surplus electricity exported to the grid. The company is also F-Gas registered and provides air conditioning and heat pump services alongside solar and EV charging.

Lectec Ltd is listed in the Suffolk Business Directory, on Checkatrade, and on the Joosup EV installer platform. Their broad service offering — covering electrical safety certificates, testing and inspection, solar PV, battery storage, air conditioning, heat pumps, and EV chargers — makes them a versatile local provider for residential and commercial customers across the Colchester and wider East Anglia region.

Service Area

Lectec Ltd serves the following areas within a 60 km radius:

ColchesterBury St EdmundsNorwichCambridgeIpswich

Are you Lectec Ltd?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS NAPIT RECC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About Lectec Ltd

What services does Lectec Ltd offer?

Lectec Ltd offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Lectec Ltd MCS certified?

Yes, Lectec Ltd is MCS certified and also holds NAPIT, RECC certifications. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Lectec Ltd serve?

Lectec Ltd serves Colchester, Bury St Edmunds, Norwich, Cambridge, Ipswich. They are based in Colchester with a service radius of 60 km.

What warranty does Lectec Ltd offer?

Lectec Ltd offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Lectec Ltd's customer reviews?

Lectec Ltd does not have any reviews yet. Be the first to leave a review after using their services.

How long has Lectec Ltd been in business?

Lectec Ltd was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Lectec Ltd

Fill in your details and we'll connect you with Lectec Ltd.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote