LS

LightWave Solar

Experienced turn-key solar EPC firm serving Tennessee, Kentucky, and Alabama with over 500 projects since 2006

Huntsville, Alabama
4.7 (27 reviews)
Residential Commercial

20+

Years in Business

500+

Projects Completed

27

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

7.7 / 10
Customer Reviews
94%
Certifications
0%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
100%

About LightWave Solar

LightWave Solar is an experienced turn-key solar engineering, procurement, and construction firm headquartered at 3026 Owen Drive, Suite 104, Antioch, TN 37013. Founded in 2006, LightWave Solar has designed and installed over 500 solar projects across the Midsouth, serving Tennessee, Kentucky, and Alabama including the Huntsville market.

LightWave Solar provides full turn-key solar and battery solutions for residential, commercial, municipal, and utility-scale clients. The company handles every step from initial consultation and custom system design to permitting, installation, and ongoing maintenance. LightWave Solar has completed projects in the Huntsville area including installations at the U.S. Space and Rocket Center and has held commercial solar seminars at the Nexus Energy Center in Huntsville.

The company serves the Tennessee Valley and Southeast region, providing solar solutions tailored to the TVA service territory and local utility requirements.

Service Area

LightWave Solar serves the following areas within a 124-mile radius:

HuntsvilleMadisonDecaturNashvilleChattanoogaKnoxville

Are you LightWave Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Maintenance
Monitoring
Grid Connection

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

27 reviews

Verified Customer

2 September 2025
Verified Customer

LightWave Solar has been in business since 2006 and their expertise was evident throughout our project. Professional installation and excellent follow-up support.

Verified Customer

18 June 2025
Verified Customer

Great experience with LightWave Solar for our commercial installation in the Huntsville area. They handled everything from design to interconnection seamlessly.

Verified Customer

5 March 2025
Verified Customer

LightWave installed a residential solar system with battery backup for our home. The team was knowledgeable and the system has been performing reliably.

Frequently Asked Questions About LightWave Solar

What services does LightWave Solar offer?

LightWave Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance, Monitoring, Grid Connection.

Is LightWave Solar NABCEP certified?

LightWave Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does LightWave Solar serve?

LightWave Solar serves Huntsville, Madison, Decatur, Nashville, Chattanooga, Knoxville. They are based in Huntsville with a service radius of 200 km.

What warranty does LightWave Solar offer?

LightWave Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are LightWave Solar's customer reviews?

LightWave Solar has a 4.7/5 rating based on 27 customer reviews. Customers consistently rate them highly.

How long has LightWave Solar been in business?

LightWave Solar was founded in 2006 and has been in business for 20 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from LightWave Solar

Fill in your details and we'll connect you with LightWave Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote