Longhorn Solar
Texas-born solar installer with more NABCEP-certified professionals than any other company in the state
17+
Years in Business
79
Customer Reviews
99 mi
Service Area
51-200
Employees
SurgePV Score
About Longhorn Solar
Longhorn Solar is a Texas-headquartered solar installation company founded in 2009 with corporate offices in Pflugerville, near Austin. The company serves residential and commercial customers across Austin, San Antonio, Dallas, and surrounding communities. Longhorn Solar employs more NABCEP-certified solar professionals than any other company in Texas, with a Director of Operations who holds a Master Electrician license and six NABCEP Certified Professionals on staff.
The company provides solar PV installations for homes and small businesses, new construction solar integration, and battery backup systems. Longhorn Solar installs panels from manufacturers like REC, Silfab, and Mission Solar paired with Enphase microinverters and SolarEdge optimizers. Battery storage options include the Tesla Powerwall and Enphase IQ Battery. With a combined 31 years of solar experience on the team, the company has built a reputation for technical expertise in the Central Texas market.
Longhorn Solar is BBB-accredited with an A+ rating and provides both a 25-year equipment warranty and a 25-year workmanship warranty. The company guarantees that its solar energy systems will operate at peak performance for as long as they are in use. On Yelp, the company has 79 reviews with customers praising their efficient installation process and knowledgeable team.
Service Area
Longhorn Solar serves the following areas within a 99-mile radius:
Contact Information
Are you Longhorn Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
79 reviews
Chris M.
Longhorn Solar made the entire process seamless. From the initial consultation to the final inspection, their team was knowledgeable and professional. Our 8.5 kW system is performing above projections.
Jennifer L.
We had a great experience with Longhorn. Their NABCEP-certified installers were thorough and careful with our roof. The system was up and running within three weeks of signing the contract.
Robert P.
The installation quality is solid and the system works well. However, getting someone on the phone for post-install questions has been difficult. Would appreciate better customer service follow-up.
Frequently Asked Questions About Longhorn Solar
What services does Longhorn Solar offer?
Longhorn Solar offers Solar Installation, Battery Storage, Solar Design, Grid Connection, Monitoring, Maintenance.
Is Longhorn Solar NABCEP certified?
Yes, Longhorn Solar is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Longhorn Solar serve?
Longhorn Solar serves Austin, San Antonio, Dallas, Pflugerville, Round Rock, Cedar Park, Georgetown, New Braunfels and 1 other areas. They are based in Austin with a service radius of 160 km.
What warranty does Longhorn Solar offer?
Longhorn Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Longhorn Solar's customer reviews?
Longhorn Solar has a 4.5/5 rating based on 79 customer reviews. Customers consistently rate them highly.
How long has Longhorn Solar been in business?
Longhorn Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Austin
Get a Free Solar Quote from Longhorn Solar
Fill in your details and we'll connect you with Longhorn Solar.
Quote request sent!
Longhorn Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile