LS

Longhorn Solar

Family-owned Texas solar company since 2009 with A+ BBB rating and NABCEP-certified installers

Dallas, Texas
4.3 (79 reviews)
Verified
Residential Commercial

17+

Years in Business

2,300+

Projects Completed

79

Customer Reviews

50 mi

Service Area

51-200

Employees

SurgePV Score

8.8 / 10
Customer Reviews
86%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
100%
Online Presence
100%

About Longhorn Solar

Longhorn Solar is a family-owned Texas solar installation company founded in 2009, with a Dallas-Fort Worth office at 701 E Plano Pkwy, Suite 305, Plano, TX 75074. The company also maintains offices in Round Rock (corporate headquarters) and San Antonio. Longhorn Solar has completed over 2,300 installations across Texas and holds an A+ BBB rating and NABCEP certification.

The company provides residential and commercial solar panel installations, battery backup systems, and EV charging stations throughout the Dallas-Fort Worth metroplex. Longhorn Solar offers a 25-year workmanship warranty and a 25-year performance guarantee on all systems, handling the full process from consultation through design, permitting, installation, and utility interconnection.

Longhorn Solar holds a 4.3-star rating from customer reviews across multiple platforms. The company is one of the longest-operating solar installers in Texas and emphasizes quality installation with certified, industry-trusted equipment brands.

Service Area

Longhorn Solar serves the following areas within a 50-mile radius:

DallasPlanoFriscoMcKinneyAllenRichardsonFort WorthArlington

Are you Longhorn Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

NABCEP BBB A+

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.3

79 reviews

Verified Customer

8 September 2025
Verified Customer

Longhorn Solar has been around since 2009 and it shows in their professionalism. The NABCEP-certified team designed and installed our system efficiently.

Verified Customer

15 June 2025
Verified Customer

Good experience with Longhorn Solar in Plano. The 25-year workmanship warranty gave us peace of mind. Installation was completed on schedule.

Verified Customer

2 April 2025
Verified Customer

Chose Longhorn for their long track record in Texas. The team was knowledgeable and the system has been producing above expectations since installation.

Frequently Asked Questions About Longhorn Solar

What services does Longhorn Solar offer?

Longhorn Solar offers Solar Installation, Battery Storage, EV Charging.

Is Longhorn Solar NABCEP certified?

Yes, Longhorn Solar is NABCEP certified and also holds BBB A+ certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Longhorn Solar serve?

Longhorn Solar serves Dallas, Plano, Frisco, McKinney, Allen, Richardson, Fort Worth, Arlington. They are based in Dallas with a service radius of 80 km.

What warranty does Longhorn Solar offer?

Longhorn Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are Longhorn Solar's customer reviews?

Longhorn Solar has a 4.3/5 rating based on 79 customer reviews. They are well-regarded by their customers.

How long has Longhorn Solar been in business?

Longhorn Solar was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Longhorn Solar

Fill in your details and we'll connect you with Longhorn Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote