Magic Solar
Idaho's trusted commercial and residential solar installer serving Boise and the Magic Valley with comprehensive design and installation services
6+
Years in Business
20
Customer Reviews
124 mi
Service Area
11-50
Employees
SurgePV Score
About Magic Solar
Magic Solar, also known as The Solar Team, is an Idaho solar installation company with offices in Boise at 7255 W Franklin Road, Suite B, and in Jerome at 395 Railway Street, Suite B. The company serves residential and commercial customers throughout the Treasure Valley and the Magic Valley region, including Boise, Twin Falls, and surrounding communities. Jesse Simpson manages the Boise operations.
The company provides comprehensive solar solutions including system design, engineering, permitting, equipment procurement, installation, and utility interconnection. Magic Solar works with high-quality tier-1 solar panels alongside Enphase and SolarEdge inverter systems and battery storage options. The company handles both rooftop and ground-mounted installations for residential homes, commercial buildings, and agricultural properties.
Magic Solar maintains a 4.6-star rating from customer reviews, with clients praising the company’s competitive pricing, professional installation crews, and thorough project management. The company offers free solar consultations and provides financing assistance to help Idaho homeowners and businesses transition to solar energy. Magic Solar can be reached at their Boise office at (208) 266-3258 or their Jerome office at (208) 944-4931.
Service Area
Magic Solar serves the following areas within a 124-mile radius:
Contact Information
Are you Magic Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
20 reviews
Patrick O.
Magic Solar designed and installed a commercial system for our business in Boise. Jesse and his team were professional throughout and the system is producing above our projections. Strong recommendation.
Kelly R.
We chose Magic Solar for our residential installation because of their local reputation. The consultation was thorough, the pricing was competitive, and the installation crew was efficient and courteous.
Thomas G.
Good solar company serving both Boise and the Magic Valley. Our residential system was installed in one day and has been running well since. The team handled all the permitting and utility paperwork.
Frequently Asked Questions About Magic Solar
What services does Magic Solar offer?
Magic Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Maintenance, Monitoring.
Is Magic Solar NABCEP certified?
Magic Solar holds the following certifications: Licensed Idaho Contractor. Contact them directly for the latest accreditation details.
What areas does Magic Solar serve?
Magic Solar serves Boise, Twin Falls, Jerome, Meridian, Nampa, Eagle, Caldwell. They are based in Boise with a service radius of 200 km.
What warranty does Magic Solar offer?
Magic Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Magic Solar's customer reviews?
Magic Solar has a 4.6/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Magic Solar been in business?
Magic Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in Boise
Get a Free Solar Quote from Magic Solar
Fill in your details and we'll connect you with Magic Solar.
Quote request sent!
Magic Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile