NS

NATiVE Solar

One of the longest-running Texas-owned solar installers with over 1,000 projects and 60 MW installed statewide

Austin, Texas
4.6 (92 reviews)
Verified
Residential Commercial

19+

Years in Business

1,000+

Projects Completed

92

Customer Reviews

99 mi

Service Area

11-50

Employees

SurgePV Score

9.2 / 10
Customer Reviews
92%
Certifications
90%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
75%

About NATiVE Solar

NATiVE Solar is one of the longest-running, Texas-owned and operated solar installation companies in the state. The company traces its origins to 2007, when it was founded in the Texas Hill Country as Hill Country EcoBuilders to design and build affordable zero-energy custom green homes. In 2009, the company spun off Hill Country EcoPower to focus on renewable energy system integrations, and in 2012 the two entities merged under the NATiVE Solar brand. Today, the company has offices in Austin, San Antonio, and Dallas.

NATiVE Solar holds NABCEP PV Installation Professional certification, a Texas electrical license, a Texas mechanical license, and maintains a BBB A+ rating. The company is a member of the Amicus Solar Cooperative, a national network of values-driven solar providers focused on ethics, quality, and impact. NATiVE’s team has a combined experience of over 1,000 solar projects totaling more than 60 MW of installed capacity across Texas and a dozen other states.

The company installs panels from Mission Solar, REC, and Qcells alongside Enphase microinverters, SolarEdge optimizers, and battery storage from Tesla and Enphase. NATiVE serves both residential homeowners and commercial customers, offering full-service design, engineering, permitting, installation, and ongoing monitoring. The company understands the specific challenges of building solar in Texas, from extreme heat to the ERCOT grid.

Service Area

NATiVE Solar serves the following areas within a 99-mile radius:

AustinSan AntonioDallasDripping SpringsRound RockCedar ParkGeorgetownKyleNew Braunfels

Are you NATiVE Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Maintenance
Monitoring
Grid Connection
Commercial Solar

Certifications & Accreditations

NABCEP BBB Accredited Amicus Solar Cooperative Member

Partner Manufacturers

Panels

Mission SolarRECQcells

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

92 reviews

Amanda H.

5 September 2025
Verified Customer

NATiVE Solar was hands down the most knowledgeable company we talked to. They took the time to explain every option and designed a system that perfectly fit our home and energy goals. Production has exceeded estimates every month.

James W.

14 June 2025
Verified Customer

We went with NATiVE because they are locally owned and have been doing this in Texas for over a decade. The installation crew was courteous and left our property spotless. Highly recommend.

Karen D.

28 March 2025
Verified Customer

Good quality installation and the system is performing well. The process took a bit longer than expected due to permitting delays with the city, but NATiVE kept us informed throughout.

Frequently Asked Questions About NATiVE Solar

What services does NATiVE Solar offer?

NATiVE Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Maintenance, Monitoring, Grid Connection, Commercial Solar.

Is NATiVE Solar NABCEP certified?

Yes, NATiVE Solar is NABCEP certified and also holds BBB Accredited, Amicus Solar Cooperative Member certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does NATiVE Solar serve?

NATiVE Solar serves Austin, San Antonio, Dallas, Dripping Springs, Round Rock, Cedar Park, Georgetown, Kyle and 1 other areas. They are based in Austin with a service radius of 160 km.

What warranty does NATiVE Solar offer?

NATiVE Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are NATiVE Solar's customer reviews?

NATiVE Solar has a 4.6/5 rating based on 92 customer reviews. Customers consistently rate them highly.

How long has NATiVE Solar been in business?

NATiVE Solar was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from NATiVE Solar

Fill in your details and we'll connect you with NATiVE Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote