South Coast Solar
Louisiana's largest SunPower Master Dealer and Tesla Powerwall installer with NABCEP-certified crews since 2007
19+
Years in Business
80
Customer Reviews
124 mi
Service Area
11-50
Employees
SurgePV Score
About South Coast Solar
South Coast Solar is Louisiana’s largest solar energy company, founded in 2007 and headquartered at 2605 Ridgelake Drive in Metairie. The company is one of only 38 SunPower Master Dealers in the United States, installing some of the most efficient and durable solar panels available. South Coast Solar is also a Tesla Powerwall Certified Installer and holds NABCEP certification, the industry’s gold standard for solar professionals.
The company specializes in both residential and commercial solar installations with a design-build approach that covers every aspect of the project including utility negotiations, tax incentive guidance, and grant and rebate filings. South Coast Solar maintains an A+ rating with the Better Business Bureau and serves customers across Louisiana, Georgia, North Carolina, and South Carolina.
South Coast Solar has been a partner in the Solar for All NOLA program, a partnership between the City of New Orleans, The Greater New Orleans Foundation, and local solar companies that makes solar more affordable for residents through leasing and financing options. The company’s office is open Monday through Friday from 7am to 5pm and Saturday from 8am to 1pm.
Service Area
South Coast Solar serves the following areas within a 124-mile radius:
Contact Information
Are you South Coast Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
80 reviews
Verified Customer
South Coast Solar installed SunPower panels and a Tesla Powerwall on our home in Metairie. The system performed flawlessly during hurricane season, keeping our essential loads running during a two-day outage.
Verified Customer
As one of only 38 SunPower Master Dealers nationwide, South Coast Solar installs the highest efficiency panels on the market. Our system is producing more than estimated and our Entergy bill is now under $20 most months.
Verified Customer
Professional installation and good communication throughout the project. The NABCEP-certified team completed the work in two days. The only minor issue was a scheduling delay due to permit processing, but that is outside their control.
Frequently Asked Questions About South Coast Solar
What services does South Coast Solar offer?
South Coast Solar offers Solar Installation, Battery Storage, Solar Design, Commercial Solar, Maintenance.
Is South Coast Solar NABCEP certified?
Yes, South Coast Solar is NABCEP certified and also holds SunPower Master Dealer, Tesla Powerwall Certified Installer, BBB A+ Rating certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does South Coast Solar serve?
South Coast Solar serves New Orleans, Metairie, Kenner, Slidell, Covington, Mandeville, Baton Rouge, Hammond. They are based in New Orleans with a service radius of 200 km.
What warranty does South Coast Solar offer?
South Coast Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are South Coast Solar's customer reviews?
South Coast Solar has a 4.7/5 rating based on 80 customer reviews. Customers consistently rate them highly.
How long has South Coast Solar been in business?
South Coast Solar was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in New Orleans
Get a Free Solar Quote from South Coast Solar
Fill in your details and we'll connect you with South Coast Solar.
Quote request sent!
South Coast Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile