NOLA Solar Power
Locally owned New Orleans solar company providing grid-tied and off-grid solar solutions for over 10 years
12+
Years in Business
12
Customer Reviews
50 mi
Service Area
2-10
Employees
SurgePV Score
About NOLA Solar Power
NOLA Solar Power is a locally owned and operated solar panel installation company based at 1423 Pine Street in New Orleans. The company has been helping homeowners and businesses switch to solar power for over 10 years, specializing in both grid-tied solar systems and off-grid solar solutions. NOLA Solar Power serves the greater New Orleans metropolitan area with a focus on personalized service and local market expertise.
The company provides end-to-end solar installation services including system design, permitting, professional installation, and ongoing maintenance and repair. NOLA Solar Power’s experience with both grid-connected and off-grid systems allows them to serve a wide range of customers, from urban homeowners looking to reduce their Entergy bills to rural property owners seeking complete energy independence.
NOLA Solar Power offers free solar consultations and provides detailed proposals showing expected energy production, savings, and system performance for each property. The company maintains a presence on the EnergySage Marketplace and has built a loyal customer base through word-of-mouth referrals in the New Orleans community. Consultations can be scheduled through their website or by calling directly.
Service Area
NOLA Solar Power serves the following areas within a 50-mile radius:
Contact Information
Are you NOLA Solar Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
12 reviews
Verified Customer
NOLA Solar Power installed a grid-tied system on our Uptown home. The team was knowledgeable about local permitting requirements and coordinated directly with Entergy for the interconnection. The system has exceeded our production expectations.
Verified Customer
We chose NOLA Solar Power for an off-grid system at our camp. They designed a system with battery storage that keeps everything running independently. Very happy with the reliability and performance.
Verified Customer
Good local company with fair pricing. The installation was completed on schedule and the system is working well. They offer both grid-tied and off-grid options which gave us flexibility in our system design.
Frequently Asked Questions About NOLA Solar Power
What services does NOLA Solar Power offer?
NOLA Solar Power offers Solar Installation, Solar Design, Maintenance.
Is NOLA Solar Power NABCEP certified?
NOLA Solar Power holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does NOLA Solar Power serve?
NOLA Solar Power serves New Orleans, Metairie, Kenner, Gretna, Algiers, Gentilly, Lakeview. They are based in New Orleans with a service radius of 80 km.
What warranty does NOLA Solar Power offer?
NOLA Solar Power offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are NOLA Solar Power's customer reviews?
NOLA Solar Power has a 4.5/5 rating based on 12 customer reviews. Customers consistently rate them highly.
How long has NOLA Solar Power been in business?
NOLA Solar Power was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.
Similar Installers in New Orleans
Get a Free Solar Quote from NOLA Solar Power
Fill in your details and we'll connect you with NOLA Solar Power.
Quote request sent!
NOLA Solar Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile