Norcroft Energy
Yorkshire MCS-accredited family solar and electrical contractor serving homes and businesses
2026+
Years in Business
80 km
Service Area
1-10
Employees
SurgePV Score
About Norcroft Energy
Norcroft Energy (trading name of Norcroft Electrical Ltd) is a family-run electrical and solar PV contractor based at Baggerwood Farm, Baggerwood Road, Thurgoland, Sheffield, S35 7AX. The company has been established for over 10 years and serves domestic and commercial customers across Yorkshire, including the York area, Barnsley, Leeds, Harrogate, and Sheffield.
Norcroft Energy holds MCS accreditation and RECC membership, the latter backed by the Trading Standards Institute, providing customers with a formal guarantee of service quality and fair trading. The company installs solar PV systems and battery storage, including Tesla Powerwall installations, and provides ongoing solar maintenance across Yorkshire.
Customer testimonials highlight meticulous pre-installation consultation, professional on-site teams, and a minimum of disruption during works. One customer noted that the scope of work was explained in every detail before the team arrived, and another confirmed a smooth Tesla Powerwall installation in 2023. Norcroft Energy also offers renewable energy solutions for farm and agricultural properties through its specialist rural energy service.
The company can be contacted on 01226 763127 or by email at [email protected]. For York and wider Yorkshire homeowners or businesses seeking a reliable, independently-run solar and electrical contractor with strong customer references, Norcroft Energy is a well-regarded regional option.
Service Area
Norcroft Energy serves the following areas within a 80 km radius:
Contact Information
Are you Norcroft Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
0
0 reviews
Verified Customer
The scope of works were explained in every detail taking into account our requirements. The installation was carried out on time and with a minimum of disruption. The team were thoughtful and professional in every aspect of the work.
Verified Customer
Norcroft installed our Solar PV and Tesla Powerwall system in 2023. The install went smoothly and was straightforward. Highly recommended.
Frequently Asked Questions About Norcroft Energy
What services does Norcroft Energy offer?
Norcroft Energy offers Solar Installation, Battery Storage, Maintenance.
Is Norcroft Energy MCS certified?
Yes, Norcroft Energy is MCS certified and also holds RECC certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does Norcroft Energy serve?
Norcroft Energy serves York, Sheffield, Barnsley, Leeds, Harrogate, Wakefield. They are based in York with a service radius of 80 km.
What warranty does Norcroft Energy offer?
Norcroft Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Norcroft Energy's customer reviews?
Norcroft Energy does not have any reviews yet. Be the first to leave a review after using their services.
How long has Norcroft Energy been in business?
Norcroft Energy was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in York
Get a Free Solar Quote from Norcroft Energy
Fill in your details and we'll connect you with Norcroft Energy.
Quote request sent!
Norcroft Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile