NC

NRG Clean Power

California solar and battery installer with over 30 years of industry experience

Riverside, California
4.5 (80 reviews)
Residential Commercial

33+

Years in Business

0

80

Customer Reviews

62 mi

Service Area

51-200

Employees

SurgePV Score

6.8 / 10
Customer Reviews
90%
Certifications
0%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About NRG Clean Power

NRG Clean Power is a solar panel and battery installation company with over 30 years of experience in the California renewable energy market. The company serves Riverside and communities throughout California including Los Angeles, San Jose, San Diego, and Orange County with residential and commercial solar installations, energy storage solutions, EV charging, and roofing services.

The company provides comprehensive solar energy solutions from initial consultation and system design through engineering, permitting, installation, and post-installation monitoring. NRG Clean Power handles projects of varying scales, from residential rooftop systems to larger commercial installations, and offers battery storage integration for energy independence.

NRG Clean Power maintains a statewide presence with service coverage across major California markets. The company’s three decades of industry experience provide customers with an established track record and the technical expertise needed for complex solar installations in the diverse building and climate conditions found across Riverside County and Southern California.

Service Area

NRG Clean Power serves the following areas within a 62-mile radius:

RiversideLos AngelesSan JoseSan DiegoOrange County

Are you NRG Clean Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

80 reviews

Victor L.

2 November 2025
Verified Customer

NRG Clean Power installed a solar and battery system at our home in Riverside. They were professional, on time, and the system has been performing perfectly.

Sharon P.

19 August 2025
Verified Customer

With 30 years in the business, NRG Clean Power knows what they are doing. The installation was seamless and their customer service was responsive throughout.

Harold M.

28 May 2025
Verified Customer

Good installation experience. They offer a wide range of services including EV charging which was convenient. System has been running well since installation.

Frequently Asked Questions About NRG Clean Power

What services does NRG Clean Power offer?

NRG Clean Power offers Solar Installation, Battery Storage, EV Charging.

Is NRG Clean Power NABCEP certified?

NRG Clean Power holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does NRG Clean Power serve?

NRG Clean Power serves Riverside, Los Angeles, San Jose, San Diego, Orange County. They are based in Riverside with a service radius of 100 km.

What warranty does NRG Clean Power offer?

NRG Clean Power offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are NRG Clean Power's customer reviews?

NRG Clean Power has a 4.5/5 rating based on 80 customer reviews. Customers consistently rate them highly.

How long has NRG Clean Power been in business?

NRG Clean Power was founded in 1993 and has been in business for 33 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from NRG Clean Power

Fill in your details and we'll connect you with NRG Clean Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote