NC

NRG Clean Power

Award-winning solar installer with offices in Sacramento and across California, offering virtual and in-home consultations

Sacramento, California
4.3 (113 reviews)
Verified
Residential Commercial

14+

Years in Business

0

113

Customer Reviews

75 mi

Service Area

51-200

Employees

SurgePV Score

8.2 / 10
Customer Reviews
86%
Certifications
60%
Experience
85%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About NRG Clean Power

NRG Clean Power is a solar installation company founded in 2012 with a Sacramento office at 9821 Business Park Drive. The company operates multiple offices across California, including Los Angeles, San Diego, and San Jose, and is ranked among the top solar installers on the EnergySage Marketplace for the Sacramento region. NRG Clean Power serves both residential and commercial customers.

The company offers both virtual and in-home consultations, giving homeowners flexibility in how they begin the solar process. NRG Clean Power handles system design, permitting, installation, and utility interconnection. Their multi-location California presence provides resources and support across a wide service area while maintaining local offices for in-person service.

NRG Clean Power is BBB accredited and maintains a 4.3-star average rating from 113 customer reviews. The company is known for competitive pricing, professional installations, and a streamlined process from initial consultation to system activation. NRG Clean Power offers 25-year manufacturer warranties on panels and inverters plus a 10-year workmanship guarantee on all installations.

Service Area

NRG Clean Power serves the following areas within a 75-mile radius:

SacramentoElk GroveRancho CordovaRosevilleFolsomDavisStocktonModesto

Are you NRG Clean Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Commercial Solar

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.3

113 reviews

Victor L.

30 October 2025
Verified Customer

NRG Clean Power made the solar process simple. We started with a virtual consultation and had panels installed within six weeks. The system is generating strong production numbers in our Sacramento home.

Carol M.

5 July 2025
Verified Customer

Good company with a professional approach. They offer both virtual and in-home consultations which was convenient for our schedule. The installation crew was efficient and left our property clean.

Tony S.

15 March 2025
Verified Customer

Chose NRG Clean Power because they were ranked among the top installers on EnergySage. The process was straightforward and the pricing was competitive. System has been performing as expected for three months.

Frequently Asked Questions About NRG Clean Power

What services does NRG Clean Power offer?

NRG Clean Power offers Solar Installation, Battery Storage, Solar Design, Commercial Solar.

Is NRG Clean Power NABCEP certified?

NRG Clean Power holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does NRG Clean Power serve?

NRG Clean Power serves Sacramento, Elk Grove, Rancho Cordova, Roseville, Folsom, Davis, Stockton, Modesto. They are based in Sacramento with a service radius of 120 km.

What warranty does NRG Clean Power offer?

NRG Clean Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are NRG Clean Power's customer reviews?

NRG Clean Power has a 4.3/5 rating based on 113 customer reviews. They are well-regarded by their customers.

How long has NRG Clean Power been in business?

NRG Clean Power was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from NRG Clean Power

Fill in your details and we'll connect you with NRG Clean Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote