NRG Clean Power
NABCEP-accredited San Jose solar, battery, and EV charging installer with 766+ reviews and A+ BBB rating
14+
Years in Business
766
Customer Reviews
62 mi
Service Area
51-200
Employees
SurgePV Score
About NRG Clean Power
NRG Clean Power is a NABCEP-accredited solar installation company headquartered at 75 East Santa Clara Street in San Jose, California. The company designs and installs residential and commercial solar systems, battery storage, EV charging stations, and smart panel systems from SPAN and Schneider. NRG Clean Power holds certifications with Enphase, REC, and Tesla, and maintains an A+ rating with the Better Business Bureau. The company has accumulated over 766 reviews across platforms, with a 4.7-star average rating.
NRG Clean Power installs panels from REC, Hyundai, Qcells, and Canadian Solar, paired with inverters from Enphase and SolarEdge. Battery options include Enphase, Tesla Powerwall, Franklin, Schneider, and Anker systems. The company also provides roof replacement services, allowing homeowners to bundle roofing and solar into a single project. NRG operates multiple locations across California, including offices in San Jose, Sacramento, and the Bay Area.
The company is a member of the California Solar and Storage Association and holds certifications from ASES, SEPA, and Solar Power World. NRG Clean Power serves homeowners and businesses throughout the San Jose metro area and broader Northern California, handling everything from system design and permitting through installation and ongoing monitoring.
Service Area
NRG Clean Power serves the following areas within a 62-mile radius:
Contact Information
Are you NRG Clean Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
766 reviews
Sarah W.
NRG Clean Power handled our solar and battery installation perfectly. From the initial consultation to the final city inspection, everything was seamless. Our system is generating more than projected.
Tom H.
Great company to work with. They installed an EV charger along with our solar panels and battery. The crew was professional and finished in two days. Very happy with the results.
Patricia N.
Solid experience overall. The sales team was knowledgeable and not pushy. Installation went smoothly. The only delay was waiting for PG&E interconnection, which NRG handled for us.
Frequently Asked Questions About NRG Clean Power
What services does NRG Clean Power offer?
NRG Clean Power offers Solar Installation, Battery Storage, EV Charging, Solar Design, Roof Assessment, Monitoring, Maintenance.
Is NRG Clean Power NABCEP certified?
Yes, NRG Clean Power is NABCEP certified and also holds BBB Accredited, Enphase Certified, REC Certified, Tesla Certified, CSSA Member certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does NRG Clean Power serve?
NRG Clean Power serves San Jose, Santa Clara, Sunnyvale, Mountain View, Fremont, Oakland, San Francisco, Sacramento. They are based in San Jose with a service radius of 100 km.
What warranty does NRG Clean Power offer?
NRG Clean Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are NRG Clean Power's customer reviews?
NRG Clean Power has a 4.7/5 rating based on 766 customer reviews. Customers consistently rate them highly.
How long has NRG Clean Power been in business?
NRG Clean Power was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.
Similar Installers in San Jose
Get a Free Solar Quote from NRG Clean Power
Fill in your details and we'll connect you with NRG Clean Power.
Quote request sent!
NRG Clean Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile