NE

NuWatt Energy

Solar, battery storage, and smart home technology across nine states since 2008

Boston, Massachusetts
4.9 (150 reviews)
Verified
Residential Commercial

18+

Years in Business

2,500+

Projects Completed

150

Customer Reviews

62 mi

Service Area

51-100

Employees

SurgePV Score

8.6 / 10
Customer Reviews
98%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
100%

About NuWatt Energy

NuWatt Energy is a solar installation company founded in 2008 by Dr. Aiman Alawa, headquartered at 400 Tradecenter Dr, Suite 5900 in Woburn, Massachusetts. The company serves nine states including Massachusetts, New Hampshire, Maine, Vermont, Connecticut, Rhode Island, Pennsylvania, New Jersey, and Texas, with over 2,500 completed solar installations.

NuWatt provides residential and commercial solar panel installation, battery storage systems, and EV charging stations. The company also works in agrivoltaics and smart home technology. Their Massachusetts office serves the Greater Boston area and communities across the state, handling all aspects from system design through permitting and installation.

NuWatt Energy holds an A+ BBB rating and a 4.9-star Google rating. The company maintains NABCEP-certified staff and has been recognized on the Inc. 5000 list. They offer free consultations and handle all utility paperwork and incentive applications on behalf of their customers.

Service Area

NuWatt Energy serves the following areas within a 62-mile radius:

BostonWoburnCambridgeLowellWorcesterSpringfield

Are you NuWatt Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Certifications & Accreditations

NABCEP

Partner Manufacturers

Panels

RECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

150 reviews

Brian C.

25 September 2025
Verified Customer

NuWatt made going solar simple. Their team was knowledgeable about Massachusetts incentives and helped us understand the financials clearly. Installation was clean and efficient.

Emily W.

30 July 2025
Verified Customer

Great company to work with. The design team optimized our system for maximum production and the installation crew was professional and respectful of our property.

James P.

12 June 2025
Verified Customer

Good overall experience. The system is performing well and the team was responsive to our questions throughout the process. Minor scheduling delays but nothing major.

Frequently Asked Questions About NuWatt Energy

What services does NuWatt Energy offer?

NuWatt Energy offers Solar Installation, Battery Storage, EV Charging.

Is NuWatt Energy NABCEP certified?

Yes, NuWatt Energy is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does NuWatt Energy serve?

NuWatt Energy serves Boston, Woburn, Cambridge, Lowell, Worcester, Springfield. They are based in Boston with a service radius of 100 km.

What warranty does NuWatt Energy offer?

NuWatt Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are NuWatt Energy's customer reviews?

NuWatt Energy has a 4.9/5 rating based on 150 customer reviews. Customers consistently rate them highly.

How long has NuWatt Energy been in business?

NuWatt Energy was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from NuWatt Energy

Fill in your details and we'll connect you with NuWatt Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote