OHM Solar Solutions
Local Sacramento solar company with over 20 years of combined design and installation experience
6+
Years in Business
187
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About OHM Solar Solutions
OHM Solar Solutions is a solar installation company led by CEO Cody Pitts, with physical offices in Roseville at 950 Reserve Dr Suite 100 and in Chico, California. The company brings over 20 years of combined solar design and installation experience to the greater Sacramento area. OHM Solar Solutions serves residential customers across the Sacramento Valley, Sierra Foothills, and Northern Central Valley.
The company provides end-to-end solar installation services including initial consultation, custom system design, permitting, installation, and utility interconnection. OHM Solar Solutions offers battery storage options alongside standard solar panel systems and provides ongoing maintenance support. Their local presence in both Roseville and Chico allows them to serve a broad geographic area across Northern California.
OHM Solar Solutions is BBB accredited and maintains positive ratings from 187 customer reviews across multiple platforms. The company is known for a no-pressure sales approach, detailed system designs, and responsive customer communication. OHM offers 25-year manufacturer warranties on panels and inverters plus a 10-year workmanship guarantee on all installations.
Service Area
OHM Solar Solutions serves the following areas within a 62-mile radius:
Contact Information
Are you OHM Solar Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
187 reviews
Ron T.
OHM Solar Solutions designed a system that perfectly fit our roof and energy needs. The team in Roseville was responsive and professional. Installation was completed on schedule and the system is producing well.
Sandra J.
Chose OHM because they are truly local to Sacramento. The consultation was thorough and they took the time to explain everything. No high-pressure sales tactics. Very satisfied with the installation.
Dave M.
Good company with knowledgeable staff. The design process was detailed and they accommodated our specific requests. The installation went smoothly. Would recommend to neighbors.
Frequently Asked Questions About OHM Solar Solutions
What services does OHM Solar Solutions offer?
OHM Solar Solutions offers Solar Installation, Battery Storage, Solar Design, Maintenance.
Is OHM Solar Solutions NABCEP certified?
OHM Solar Solutions holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does OHM Solar Solutions serve?
OHM Solar Solutions serves Sacramento, Roseville, Chico, Elk Grove, Folsom, Davis, Yuba City. They are based in Sacramento with a service radius of 100 km.
What warranty does OHM Solar Solutions offer?
OHM Solar Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are OHM Solar Solutions's customer reviews?
OHM Solar Solutions has a 4.5/5 rating based on 187 customer reviews. Customers consistently rate them highly.
How long has OHM Solar Solutions been in business?
OHM Solar Solutions was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in Sacramento
Get a Free Solar Quote from OHM Solar Solutions
Fill in your details and we'll connect you with OHM Solar Solutions.
Quote request sent!
OHM Solar Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile