Optimum Solar Power
Riverside-based solar installer delivering affordable residential and commercial systems since 2017
9+
Years in Business
40
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Optimum Solar Power
Optimum Solar Power Inc. is a solar installation company based at 10000 Indiana Ave, Suite 2, Riverside, CA 92503. Founded in March 2017, the company provides residential, commercial, and off-grid solar panel systems to customers in Riverside and the surrounding Inland Empire communities.
The company holds an A+ rating with the Better Business Bureau and has earned consistently positive reviews from customers who highlight competitive pricing, professional installation, and responsive customer service. Optimum Solar Power offers free consultations and handles the complete project from system design through permitting, installation, and utility interconnection.
Optimum Solar Power focuses on making solar energy accessible and affordable for Riverside-area homeowners and businesses. The company offers grid-tied and off-grid solar solutions tailored to each customer’s energy needs and budget, with a commitment to fast installation timelines and transparent pricing.
Service Area
Optimum Solar Power serves the following areas within a 50-mile radius:
Contact Information
Are you Optimum Solar Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
40 reviews
Rosa M.
Optimum Solar Power gave us the best quote of the five companies we contacted. Installation was fast and the system has been producing above expectations.
Jason W.
Very professional team from start to finish. They handled all the permitting and inspections. Our electric bill went from over $200 per month to almost nothing.
Lisa T.
Great customer service and competitive pricing. The installation crew was efficient and cleaned up everything afterward. Would recommend to anyone in Riverside.
Frequently Asked Questions About Optimum Solar Power
What services does Optimum Solar Power offer?
Optimum Solar Power offers Solar Installation, Battery Storage.
Is Optimum Solar Power NABCEP certified?
Optimum Solar Power holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Optimum Solar Power serve?
Optimum Solar Power serves Riverside, Corona, Moreno Valley, San Bernardino. They are based in Riverside with a service radius of 80 km.
What warranty does Optimum Solar Power offer?
Optimum Solar Power offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Optimum Solar Power's customer reviews?
Optimum Solar Power has a 4.8/5 rating based on 40 customer reviews. Customers consistently rate them highly.
How long has Optimum Solar Power been in business?
Optimum Solar Power was founded in 2017 and has been in business for 9 years. They have solid experience in the solar industry.
Similar Installers in Riverside
Get a Free Solar Quote from Optimum Solar Power
Fill in your details and we'll connect you with Optimum Solar Power.
Quote request sent!
Optimum Solar Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile