Pacific Solar
Family-operated solar company with 40+ years of building industry experience serving Central California
18+
Years in Business
11
Customer Reviews
124 mi
Service Area
11-50
Employees
SurgePV Score
About Pacific Solar
Pacific Solar is a family-operated solar company located at 228 N Fairfax Ave, Clovis, CA 93612, serving the greater Fresno area and Central California. The company was formed in 2008 by David Wasemiller, his son Michael, and friend Garland Nelson, building on the family’s 40+ years of experience in the building industry through their parent company Valley Pacific, established in 1982.
Pacific Solar has been BBB accredited since 2010 and serves residential and commercial clients across Central California, including Fresno, Clovis, Modesto, Sacramento, Bakersfield, Stockton, and San Jose. The company provides solar installation and custom system design services.
Pacific Solar combines deep construction expertise with solar specialization, offering homeowners and businesses a reliable partner for their solar energy projects throughout the region.
Service Area
Pacific Solar serves the following areas within a 124-mile radius:
Contact Information
Are you Pacific Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
11 reviews
Verified Customer
Pacific Solar brought decades of building experience to our solar project. The family-run approach meant we dealt with the same people throughout. Quality installation.
Verified Customer
Very pleased with our solar installation. Pacific Solar has been in the building business for over 40 years and it shows in the quality of their work.
Verified Customer
Good company with deep local roots. The installation went smoothly and the system is producing as expected. Would recommend for residential solar.
Frequently Asked Questions About Pacific Solar
What services does Pacific Solar offer?
Pacific Solar offers Solar Installation, system_design.
Is Pacific Solar NABCEP certified?
Pacific Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Pacific Solar serve?
Pacific Solar serves Fresno, Clovis, Modesto, Sacramento, Bakersfield, Stockton, San Jose. They are based in Fresno with a service radius of 200 km.
What warranty does Pacific Solar offer?
Pacific Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Pacific Solar's customer reviews?
Pacific Solar has a 4.7/5 rating based on 11 customer reviews. Customers consistently rate them highly.
How long has Pacific Solar been in business?
Pacific Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Fresno
Get a Free Solar Quote from Pacific Solar
Fill in your details and we'll connect you with Pacific Solar.
Quote request sent!
Pacific Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile