PS

PacWest Solar

Residential and commercial solar installer serving the greater Spokane area from Liberty Lake

Spokane, Washington
4.7 (17 reviews)
Residential Commercial

2026+

Years in Business

0

17

Customer Reviews

75 mi

Service Area

2-10

Employees

SurgePV Score

7 / 10
Customer Reviews
94%
Certifications
0%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
75%

About PacWest Solar

PacWest Solar is a residential and commercial solar installation company based at 2207 North McKenzie Lane, Unit 107, Liberty Lake, WA 99019. The company serves the greater Spokane area, including Spokane Valley, Airway Heights, Cheney, and surrounding communities, as well as the Tri-Cities region.

PacWest Solar offers complete solar energy system design, installation, and maintenance services for both homeowners and businesses. The company provides free consultations and handles all aspects of the solar installation process, from initial assessment through permitting and utility interconnection.

Open seven days a week from 8:00 AM to 4:00 PM, PacWest Solar has built a strong local reputation for accessible service and competitive pricing across Eastern Washington.

Service Area

PacWest Solar serves the following areas within a 75-mile radius:

SpokaneSpokane ValleyLiberty LakeAirway HeightsCheneyDeer ParkMedical LakeKennewickPascoRichlandWalla Walla

Are you PacWest Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

17 reviews

Verified Customer

22 September 2025
Verified Customer

PacWest Solar provided a thorough consultation and designed a system that maximized our roof space. The installation was clean and completed on time.

Verified Customer

14 July 2025
Verified Customer

Great local solar company. They handled everything from design to permitting to installation. Very happy with the results.

Verified Customer

8 May 2025
Verified Customer

Good experience with PacWest. The team was professional and the pricing was competitive compared to other Spokane area installers.

Frequently Asked Questions About PacWest Solar

What services does PacWest Solar offer?

PacWest Solar offers Solar Installation, Battery Storage, Maintenance.

Is PacWest Solar NABCEP certified?

PacWest Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does PacWest Solar serve?

PacWest Solar serves Spokane, Spokane Valley, Liberty Lake, Airway Heights, Cheney, Deer Park, Medical Lake, Kennewick and 3 other areas. They are based in Spokane with a service radius of 120 km.

What warranty does PacWest Solar offer?

PacWest Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are PacWest Solar's customer reviews?

PacWest Solar has a 4.7/5 rating based on 17 customer reviews. Customers consistently rate them highly.

How long has PacWest Solar been in business?

PacWest Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from PacWest Solar

Fill in your details and we'll connect you with PacWest Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote