PCI Renewables
Design-build electrical and renewable energy contractor in Spokane Valley since 2009
17+
Years in Business
18
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About PCI Renewables
PCI Renewables is an electrical contracting and renewable energy firm based at 1708 N Vista Rd, Spokane Valley, WA 99212. Founded in 2009 by a team of engineers, master electricians, and contractors, the company provides design-build solutions for solar photovoltaic systems, electrical construction, and energy efficiency projects.
The company offers a full range of services including energy assessments, renewable energy design and implementation, solar PV installations, small wind and hydro systems, backup generator and emergency power systems, and lighting control systems. PCI Renewables serves both residential and commercial customers with a focus on cost-effective energy solutions.
PCI Renewables operates Monday through Thursday from 8:00 AM to 5:00 PM and Friday from 8:00 AM to 12:00 PM, providing consultation, design, and installation services across the Spokane metropolitan area.
Service Area
PCI Renewables serves the following areas within a 62-mile radius:
Contact Information
Are you PCI Renewables?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
18 reviews
Verified Customer
PCI Renewables designed and installed a commercial solar system for our business. Their engineering team was thorough and the installation met all our specifications.
Verified Customer
Good experience with PCI for our residential solar installation. The team was knowledgeable about energy efficiency and helped us understand the payback period.
Verified Customer
Professional design-build approach to our solar project. PCI handled everything from the energy assessment to final commissioning.
Frequently Asked Questions About PCI Renewables
What services does PCI Renewables offer?
PCI Renewables offers Solar Installation, Battery Storage, Maintenance, Monitoring.
Is PCI Renewables NABCEP certified?
PCI Renewables holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does PCI Renewables serve?
PCI Renewables serves Spokane, Spokane Valley, Liberty Lake, Cheney, Deer Park. They are based in Spokane with a service radius of 100 km.
What warranty does PCI Renewables offer?
PCI Renewables offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are PCI Renewables's customer reviews?
PCI Renewables has a 4.5/5 rating based on 18 customer reviews. Customers consistently rate them highly.
How long has PCI Renewables been in business?
PCI Renewables was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Spokane
Get a Free Solar Quote from PCI Renewables
Fill in your details and we'll connect you with PCI Renewables.
Quote request sent!
PCI Renewables will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile