Pittsburgh Solar
Transparent, cost-conscious Pittsburgh solar installer charging labor and materials at cost to help homeowners get the right system for their needs
6+
Years in Business
10
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Pittsburgh Solar
Pittsburgh Solar is a local solar installation company based at 9572 Perry Highway in Pittsburgh, PA 15237. The company was started by a homeowner who, frustrated with the available solar installation options in the area, completed their own installation with a trusted contractor and then decided to offer the same service to other Pittsburgh residents. Pittsburgh Solar distinguishes itself by charging labor and materials at cost only, with full transparency on every line item.
The company installs solar panels on roofs and ground mounts, handles all electrical wiring to inverters and batteries, and rewires electrical panels to integrate solar generation into existing home systems. Pittsburgh Solar coordinates with municipal inspectors for final approval, works with utility companies to set up net metering, and helps homeowners register with the state to receive Solar Renewable Energy Credits (SRECs).
Pittsburgh Solar takes a consultative approach, advising customers based on their best interests so they get only the equipment they need to achieve their energy goals. The company serves residential customers throughout the Pittsburgh metro area and offers ongoing maintenance support after installation.
Service Area
Pittsburgh Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Pittsburgh Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
5 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
10 reviews
Craig W.
Pittsburgh Solar charges labor and materials at cost, which is rare in this industry. They were transparent about every line item and advised us on exactly what we needed to meet our energy goals. No upselling.
Laura M.
We appreciated the honest, no-nonsense approach. The team installed our roof-mounted system efficiently and handled the wiring to our inverter and electrical panel professionally. Net metering setup went smoothly.
Jeff S.
Good local installer. They helped us set up Solar Renewable Energy Credits with the state and coordinated with our utility company for net metering. System is performing well after several months.
Frequently Asked Questions About Pittsburgh Solar
What services does Pittsburgh Solar offer?
Pittsburgh Solar offers Solar Installation, Battery Storage, Solar Design, Grid Connection, Maintenance.
Is Pittsburgh Solar NABCEP certified?
Pittsburgh Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Pittsburgh Solar serve?
Pittsburgh Solar serves Pittsburgh, North Hills, Ross Township, McCandless, Wexford, Allison Park. They are based in Pittsburgh with a service radius of 80 km.
What warranty does Pittsburgh Solar offer?
Pittsburgh Solar offers 25-year panel warranty, 12-year inverter warranty, and 5-year installation/workmanship warranty.
How are Pittsburgh Solar's customer reviews?
Pittsburgh Solar has a 4.5/5 rating based on 10 customer reviews. Customers consistently rate them highly.
How long has Pittsburgh Solar been in business?
Pittsburgh Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in Pittsburgh
Get a Free Solar Quote from Pittsburgh Solar
Fill in your details and we'll connect you with Pittsburgh Solar.
Quote request sent!
Pittsburgh Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile