PS

Puget Sound Solar

Seattle's most experienced solar installer, locally owned and operating since 2001

Seattle, Washington
4.9 (31 reviews)
Verified
Residential Commercial

25+

Years in Business

0

31

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

8.6 / 10
Customer Reviews
98%
Certifications
75%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
75%

About Puget Sound Solar

Puget Sound Solar is Seattle’s longest-operating solar installation company, founded in 2001 by Pam Burton and Jeremy Smithson. Located at 805 Rainier Ave S in Seattle, the company provides residential and commercial solar design and installation services throughout the Puget Sound region.

The company handles all aspects of solar projects in-house, including site assessment, system design, engineering, permitting, installation, and utility interconnection. Puget Sound Solar is BBB Accredited with an A+ rating, a distinction earned since July 2025, and holds NABCEP certification.

Puget Sound Solar maintains a 4.9-star rating across review platforms with 31 reviews on Yelp. Customers regularly praise the company’s professionalism, transparency, and quality of workmanship. The company’s two-plus decades of experience in the Pacific Northwest solar market gives it deep knowledge of local permitting requirements, utility interconnection processes, and regional climate considerations. Office hours are Monday through Friday, 9:00 AM to 5:00 PM.

Service Area

Puget Sound Solar serves the following areas within a 50-mile radius:

SeattleBellevueKirklandRedmondRenton

Are you Puget Sound Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
system_design

Certifications & Accreditations

BBB Accredited NABCEP

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

31 reviews

Rainier Valley Homeowner

5 October 2025
Verified Customer

Puget Sound Solar's attention to detail is remarkable. The team was professional, transparent with pricing, and thorough in explaining every step of the process.

Columbia City Customer

18 July 2025
Verified Customer

As the longest-running solar company in Seattle, their experience shows. Smooth permitting, clean install, and great follow-up support after commissioning.

Beacon Hill Resident

2 May 2025
Verified Customer

Quality installation and knowledgeable team. Scheduling took a bit longer than expected but the final result was worth the wait.

Frequently Asked Questions About Puget Sound Solar

What services does Puget Sound Solar offer?

Puget Sound Solar offers Solar Installation, Battery Storage, system_design.

Is Puget Sound Solar NABCEP certified?

Yes, Puget Sound Solar is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Puget Sound Solar serve?

Puget Sound Solar serves Seattle, Bellevue, Kirkland, Redmond, Renton. They are based in Seattle with a service radius of 80 km.

What warranty does Puget Sound Solar offer?

Puget Sound Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Puget Sound Solar's customer reviews?

Puget Sound Solar has a 4.9/5 rating based on 31 customer reviews. Customers consistently rate them highly.

How long has Puget Sound Solar been in business?

Puget Sound Solar was founded in 2001 and has been in business for 25 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Puget Sound Solar

Fill in your details and we'll connect you with Puget Sound Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote