PI

PV Install

MCS-accredited solar PV installer based in Salisbury, Wiltshire

Salisbury, UK
0 (0 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

40 km

Service Area

1-10

Employees

SurgePV Score

5.2 / 10
Customer Reviews
0%
Certifications
75%
Experience
100%
Services Range
40%
Warranty Coverage
63%
Online Presence
50%

About PV Install

PV Install Ltd is a solar PV installation company based at 9 Mill Road, Salisbury, Wiltshire SP4 9QB. The company is reachable on freephone 0800 002 9474 and has a Facebook presence at PVInstallSolarSalisbury. PV Install holds MCS accreditation and is a member of the Renewable Energy Consumer Code (RECC).

The company installs solar PV systems for home and business customers primarily across the Salisbury and south Wiltshire area. Directors Sandra Daniel and Morgan Hands lead the business. PV Install’s MCS certification ensures all installations meet the technical and quality standards required for SEG export tariff eligibility.

PV Install is listed on the SolarLocator installer database at its SP4 9QB address. The company serves Salisbury, Amesbury, Andover, Tidworth, Pewsey, and Devizes, covering a wide stretch of the Wiltshire and north Hampshire area from its Salisbury base.

Service Area

PV Install serves the following areas within a 40 km radius:

SalisburyAmesburyAndoverTidworthPewseyDevizes

Are you PV Install?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation

Certifications & Accreditations

MCS RECC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About PV Install

What services does PV Install offer?

PV Install offers Solar Installation.

Is PV Install MCS certified?

Yes, PV Install is MCS certified and also holds RECC certification. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does PV Install serve?

PV Install serves Salisbury, Amesbury, Andover, Tidworth, Pewsey, Devizes. They are based in Salisbury with a service radius of 40 km.

What warranty does PV Install offer?

PV Install offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are PV Install's customer reviews?

PV Install does not have any reviews yet. Be the first to leave a review after using their services.

How long has PV Install been in business?

PV Install was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from PV Install

Fill in your details and we'll connect you with PV Install.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote