RC

Rocket City Solar Systems

Huntsville-based solar installer providing residential and commercial panel installation, repair, and maintenance services

Huntsville, Alabama
4.5 (5 reviews)
Residential Commercial

2026+

Years in Business

0

5

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

7.2 / 10
Customer Reviews
90%
Certifications
0%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
75%

About Rocket City Solar Systems

Rocket City Solar Systems is a solar installation company based at 2007 Bob Wallace Avenue SW, Huntsville, AL 35805. The company provides residential and commercial solar panel installation services as well as repair and maintenance for existing solar systems in the Huntsville and North Alabama region.

Rocket City Solar Systems ranks in the top 99 percent of Alabama contractors according to BuildZoom. The company handles both new solar installations and service work on existing systems, providing a complete solar solution for Huntsville-area property owners.

Rocket City Solar Systems serves the greater Huntsville area including Madison, Decatur, Athens, Harvest, and Meridianville, offering free quotes and consultations for homeowners and businesses interested in solar energy.

Service Area

Rocket City Solar Systems serves the following areas within a 50-mile radius:

HuntsvilleMadisonDecaturAthensHarvestMeridianville

Are you Rocket City Solar Systems?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Maintenance
Grid Connection

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

5 reviews

Verified Customer

20 July 2025
Verified Customer

Rocket City Solar installed panels on our home in Huntsville and the experience was great. Local company that understands the area and TVA requirements.

Verified Customer

15 April 2025
Verified Customer

Good local installer. They handled our residential solar project efficiently and the system has been generating well. Nice to work with a Huntsville-based company.

Verified Customer

28 January 2025
Verified Customer

Professional installation and good communication throughout the process. Rocket City Solar made going solar easy for our family. Would recommend to Huntsville homeowners.

Frequently Asked Questions About Rocket City Solar Systems

What services does Rocket City Solar Systems offer?

Rocket City Solar Systems offers Solar Installation, Solar Design, Maintenance, Grid Connection.

Is Rocket City Solar Systems NABCEP certified?

Rocket City Solar Systems holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Rocket City Solar Systems serve?

Rocket City Solar Systems serves Huntsville, Madison, Decatur, Athens, Harvest, Meridianville. They are based in Huntsville with a service radius of 80 km.

What warranty does Rocket City Solar Systems offer?

Rocket City Solar Systems offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Rocket City Solar Systems's customer reviews?

Rocket City Solar Systems has a 4.5/5 rating based on 5 customer reviews. Customers consistently rate them highly.

How long has Rocket City Solar Systems been in business?

Rocket City Solar Systems was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Rocket City Solar Systems

Fill in your details and we'll connect you with Rocket City Solar Systems.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote