RE

Rocknoll Energy Systems

Renewable energy and backup power specialist serving Greater Cincinnati since 1994

Cincinnati, Ohio
4.8 (12 reviews)
Verified
Residential Commercial

32+

Years in Business

0

12

Customer Reviews

62 mi

Service Area

1-10

Employees

SurgePV Score

9.1 / 10
Customer Reviews
96%
Certifications
100%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
75%

About Rocknoll Energy Systems

Rocknoll Energy Systems is a renewable energy company located at 6344 US Route 22-3, Morrow, OH 45152, serving the Greater Cincinnati area. Founded in 1994, Rocknoll specializes in solar photovoltaic installations, energy storage systems, and backup power solutions for both residential and commercial customers.

The company is an authorized dealer of industry-leading brands including Generac, Sol-Ark, SolarEdge, and Fortress. Rocknoll provides comprehensive renewable energy solutions including solar panels, battery storage, wind systems, and generator installations.

Rocknoll Energy Systems has been BBB accredited and serves customers across Southwest Ohio with a focus on energy independence and reliable backup power.

Service Area

Rocknoll Energy Systems serves the following areas within a 62-mile radius:

CincinnatiMorrowDaytonWilmingtonMason

Are you Rocknoll Energy Systems?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

BBB Accredited Authorized Generac Dealer Authorized Sol-Ark Dealer Authorized SolarEdge Dealer

Partner Manufacturers

Inverters

SolarEdgeSol-Ark

Batteries

FortressGenerac

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

12 reviews

Verified Customer

22 July 2025
Verified Customer

Rocknoll designed a solar plus battery system that covers our entire home. Their knowledge of energy storage is outstanding and the installation was top quality.

Verified Customer

15 April 2025
Verified Customer

Great local company with decades of experience. They took the time to explain all our options and designed a system that perfectly fits our energy needs.

Verified Customer

30 January 2025
Verified Customer

Solid installation and good communication throughout the project. The backup power system has already proven its value during a recent outage.

Frequently Asked Questions About Rocknoll Energy Systems

What services does Rocknoll Energy Systems offer?

Rocknoll Energy Systems offers Solar Installation, Battery Storage, Maintenance.

Is Rocknoll Energy Systems NABCEP certified?

Rocknoll Energy Systems holds the following certifications: BBB Accredited, Authorized Generac Dealer, Authorized Sol-Ark Dealer, Authorized SolarEdge Dealer. Contact them directly for the latest accreditation details.

What areas does Rocknoll Energy Systems serve?

Rocknoll Energy Systems serves Cincinnati, Morrow, Dayton, Wilmington, Mason. They are based in Cincinnati with a service radius of 100 km.

What warranty does Rocknoll Energy Systems offer?

Rocknoll Energy Systems offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Rocknoll Energy Systems's customer reviews?

Rocknoll Energy Systems has a 4.8/5 rating based on 12 customer reviews. Customers consistently rate them highly.

How long has Rocknoll Energy Systems been in business?

Rocknoll Energy Systems was founded in 1994 and has been in business for 32 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Rocknoll Energy Systems

Fill in your details and we'll connect you with Rocknoll Energy Systems.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote