SS

Sierra Solar Systems

Reno solar contractor founded in 2005 by construction veterans serving Northern Nevada and Carson City

Reno, Nevada
4.5 (8 reviews)
Verified
Residential Commercial

21+

Years in Business

0

8

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

7.7 / 10
Customer Reviews
90%
Certifications
60%
Experience
100%
Services Range
60%
Warranty Coverage
80%
Online Presence
50%

About Sierra Solar Systems

Sierra Solar Systems is a general contractor specializing in residential and commercial solar panel design, installation, and maintenance, located at 10300 South Virginia Street, Suite B, Reno, NV 89511. Founded in 2005 by construction industry veterans, the company is one of the longer-operating solar installers in Northern Nevada.

Sierra Solar Systems provides solar engineering, design, sales, and service, along with electrical and wiring services. The company serves the greater Reno and Carson City regions with custom solar installations tailored to each property’s characteristics and energy needs.

The company handles the full project lifecycle from initial site assessment and system design through permitting, installation, and ongoing maintenance support.

Service Area

Sierra Solar Systems serves the following areas within a 50-mile radius:

RenoSparksCarson City

Are you Sierra Solar Systems?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance

Certifications & Accreditations

Nevada Licensed Contractor

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

8 reviews

Verified Customer

5 August 2025
Verified Customer

Sierra Solar Systems installed panels on our Reno home. As a company founded by construction industry veterans, the quality of the physical installation was excellent.

Verified Customer

12 May 2025
Verified Customer

Good local company with solid construction experience. They handled the engineering and permitting efficiently. The system has been performing well.

Verified Customer

28 February 2025
Verified Customer

Professional installation team with attention to detail. The electrical work and roof mounting were both done cleanly. Competitive pricing for the Reno market.

Frequently Asked Questions About Sierra Solar Systems

What services does Sierra Solar Systems offer?

Sierra Solar Systems offers Solar Installation, Maintenance.

Is Sierra Solar Systems NABCEP certified?

Sierra Solar Systems holds the following certifications: Nevada Licensed Contractor. Contact them directly for the latest accreditation details.

What areas does Sierra Solar Systems serve?

Sierra Solar Systems serves Reno, Sparks, Carson City. They are based in Reno with a service radius of 80 km.

What warranty does Sierra Solar Systems offer?

Sierra Solar Systems offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Sierra Solar Systems's customer reviews?

Sierra Solar Systems has a 4.5/5 rating based on 8 customer reviews. Customers consistently rate them highly.

How long has Sierra Solar Systems been in business?

Sierra Solar Systems was founded in 2005 and has been in business for 21 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Sierra Solar Systems

Fill in your details and we'll connect you with Sierra Solar Systems.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote