S

Simmitri

San Jose solar and roofing company since 1995, NABCEP-certified and Enphase Gold vendor with GAF Master Elite roofing status

San Jose, California
4.7 (59 reviews)
Verified
Residential Commercial

31+

Years in Business

0

59

Customer Reviews

37 mi

Service Area

11-50

Employees

SurgePV Score

9.2 / 10
Customer Reviews
94%
Certifications
100%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
50%

About Simmitri

Simmitri is a combined solar and roofing company founded in 1995 and headquartered at 6203 San Ignacio Avenue, Suite 110, in San Jose, California. With nearly three decades of experience, Simmitri holds NABCEP certification, GAF Master Elite roofing status, and Enphase Energy Gold vendor certification. The company is also Building Performance Institute (BPI) certified and a California-certified small business contractor for public works projects, operating under CSLB License #766156.

Simmitri installs Silfab solar panels paired with Enphase microinverters and battery storage systems. The company’s dual expertise in roofing and solar allows homeowners to bundle both services into a single project, ensuring roof integrity before panel installation. Simmitri handles residential and commercial projects, including system design, energy assessments, permitting, installation, and monitoring.

The company serves the greater San Jose area including Santa Clara, Sunnyvale, Campbell, Los Gatos, Saratoga, Milpitas, and Morgan Hill. Simmitri also handles government and public works solar projects. With 59 reviews on Yelp and consistent ratings above 4.5 stars, the company has built a strong reputation for quality workmanship in the South Bay.

Service Area

Simmitri serves the following areas within a 37-mile radius:

San JoseSanta ClaraSunnyvaleCampbellLos GatosSaratogaMilpitasMorgan Hill

Are you Simmitri?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Roof Assessment
Energy Audit
Maintenance

Certifications & Accreditations

NABCEP GAF Master Elite Enphase Gold Vendor BPI Certified BBB Accredited

Partner Manufacturers

Panels

Silfab

Inverters

Enphase

Batteries

Enphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

59 reviews

Karen R.

20 August 2025
Verified Customer

Simmitri replaced our roof and installed solar panels at the same time, which saved us a lot of hassle. The crew was punctual and thorough. System is performing well and the roof looks great.

Mark D.

14 May 2025
Verified Customer

Very professional from start to finish. Simmitri's team explained every step of the process. The Enphase system they installed is easy to monitor and our electricity costs have dropped significantly.

Angela S.

3 February 2025
Verified Customer

Good experience. Simmitri was thorough in their energy assessment and recommended the right-sized system for our home. Installation took one day. Minor scheduling delay at the start but otherwise smooth.

Frequently Asked Questions About Simmitri

What services does Simmitri offer?

Simmitri offers Solar Installation, Battery Storage, Solar Design, Roof Assessment, Energy Audit, Maintenance.

Is Simmitri NABCEP certified?

Yes, Simmitri is NABCEP certified and also holds GAF Master Elite, Enphase Gold Vendor, BPI Certified, BBB Accredited certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Simmitri serve?

Simmitri serves San Jose, Santa Clara, Sunnyvale, Campbell, Los Gatos, Saratoga, Milpitas, Morgan Hill. They are based in San Jose with a service radius of 60 km.

What warranty does Simmitri offer?

Simmitri offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Simmitri's customer reviews?

Simmitri has a 4.7/5 rating based on 59 customer reviews. Customers consistently rate them highly.

How long has Simmitri been in business?

Simmitri was founded in 1995 and has been in business for 31 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Simmitri

Fill in your details and we'll connect you with Simmitri.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote