SA

Solar Advantage

One of Florida's oldest PV solar installers, serving Tampa Bay since 2012

Tampa, Florida
3.9 (30 reviews)
Residential Commercial

14+

Years in Business

0

30

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

6.2 / 10
Customer Reviews
78%
Certifications
0%
Experience
85%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About Solar Advantage

Solar Advantage, also known as Advantage Roofing & Construction LLC, is a solar installation company based in Tampa, Florida. Founded in 2012, it is recognized as one of the oldest PV solar installers in the state. The company serves both residential and commercial customers in Hillsborough and Pinellas counties, with particular expertise in large business-owned commercial solar systems.

The company holds a BBB rating of A and has been BBB-accredited since April 2024. Solar Advantage can be reached at (813) 793-4097 or through the alternate number (813) 399-1231. The company serves customers throughout West Central Florida including Tampa, St. Petersburg, Clearwater, and surrounding areas.

Solar Advantage handles the complete solar installation process from initial site assessment and system design through engineering, permitting, installation, and utility interconnection. The company’s experience with both residential and large-scale commercial projects provides versatility across different project types and sizes.

Service Area

Solar Advantage serves the following areas within a 62-mile radius:

TampaSt. PetersburgClearwaterBrandonLakeland

Are you Solar Advantage?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
system_design

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

3.9

30 reviews

Verified Customer

12 August 2025
Verified Customer

Solar Advantage designed and installed a great system for our commercial property. The team was knowledgeable and professional throughout.

Verified Customer

5 June 2025
Verified Customer

Good experience with Solar Advantage. They handled all the permitting and the installation was completed on schedule.

Verified Customer

28 March 2025
Verified Customer

Fair pricing and solid installation work. The system has been performing well since it was activated.

Frequently Asked Questions About Solar Advantage

What services does Solar Advantage offer?

Solar Advantage offers Solar Installation, Battery Storage, system_design.

Is Solar Advantage NABCEP certified?

Solar Advantage holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Solar Advantage serve?

Solar Advantage serves Tampa, St. Petersburg, Clearwater, Brandon, Lakeland. They are based in Tampa with a service radius of 100 km.

What warranty does Solar Advantage offer?

Solar Advantage offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Advantage's customer reviews?

Solar Advantage has a 3.9/5 rating based on 30 customer reviews. See individual reviews on this page for more detail.

How long has Solar Advantage been in business?

Solar Advantage was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solar Advantage

Fill in your details and we'll connect you with Solar Advantage.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote