Solar Energy World
Maryland's leading residential solar provider since 2009 with employee-only installation crews and a solar-powered headquarters
17+
Years in Business
74
Customer Reviews
93 mi
Service Area
51-200
Employees
SurgePV Score
About Solar Energy World
Solar Energy World is a leading residential solar provider headquartered at 5681 Main Street in Elkridge, Maryland, in the Baltimore metropolitan area. Founded in 2009, the company has grown to serve Maryland, Delaware, Pennsylvania, New Jersey, Virginia, Florida, and Washington DC. Solar Energy World is the only solar company in Maryland whose headquarters runs entirely on solar energy installed by its own staff, and the company maintains a strict no-subcontractor policy, meaning every installer is a direct employee.
The company installs panels from REC and Silfab with Enphase microinverter or SolarEdge string inverter systems, plus Tesla Powerwall and Enphase IQ Battery storage options. Solar Energy World handles the full project process including energy audits, system design, engineering, permitting, installation, utility interconnection, and post-installation monitoring. The company offers multiple financing options and assists with state and local incentive applications.
Solar Energy World has received the Angie’s List Super Service Award and a Guildmaster Award for Service Excellence. The company holds a 4.1-star rating on HomeAdvisor and is BBB-accredited. Customers frequently note the competitive pricing, with Solar Energy World often being the least expensive option among quoted providers while maintaining quality equipment and professional installation standards.
Service Area
Solar Energy World serves the following areas within a 93-mile radius:
Contact Information
Are you Solar Energy World?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.1
74 reviews
Thomas B.
Solar Energy World was the least expensive of the three companies we got quotes from, and the quality was excellent. Their employee installers were professional and the system has been producing as projected.
Lisa M.
We appreciated that every person who worked on our roof was an actual employee, not a subcontractor. The installation was clean, efficient, and completed on time. Great communication throughout the process.
Richard W.
Solid company with competitive pricing. The design team was thorough in assessing our roof and energy usage. The only issue was a longer wait time for the initial consultation, but once started the project moved quickly.
Frequently Asked Questions About Solar Energy World
What services does Solar Energy World offer?
Solar Energy World offers Solar Installation, Solar Design, Battery Storage, Maintenance, Monitoring, financing_assistance, Energy Audit.
Is Solar Energy World NABCEP certified?
Yes, Solar Energy World is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Solar Energy World serve?
Solar Energy World serves Baltimore, Elkridge, Columbia, Towson, Annapolis, Silver Spring, Rockville, Frederick. They are based in Baltimore with a service radius of 150 km.
What warranty does Solar Energy World offer?
Solar Energy World offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Solar Energy World's customer reviews?
Solar Energy World has a 4.1/5 rating based on 74 customer reviews. They are well-regarded by their customers.
How long has Solar Energy World been in business?
Solar Energy World was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Baltimore
Get a Free Solar Quote from Solar Energy World
Fill in your details and we'll connect you with Solar Energy World.
Quote request sent!
Solar Energy World will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile