Solar Negotiators
Highest-rated local solar installer in San Diego with 1,400+ five-star Google reviews and lifetime warranty
17+
Years in Business
1,400
Customer Reviews
75 mi
Service Area
51-200
Employees
SurgePV Score
About Solar Negotiators
Solar Negotiators is a solar installation company founded in 2009 by Marine Corps veteran Chris Moran. The company operates a San Diego County office at 600 S Andreasen Dr, Suite A in Escondido, with additional offices in Fresno and Bakersfield. Solar Negotiators specializes in residential solar installations, battery storage, and roofing, offering an exclusive lifetime warranty that covers solar panels, labor, and roof penetrations.
The company is NABCEP-certified, OSHA-certified, BBB-accredited with an A+ rating, and an Owens Corning Roofing Preferred Contractor. Solar Negotiators holds over 1,400 five-star Google reviews, averaging 4.8 stars, making it one of the highest-rated solar contractors in both San Diego and California’s Central Valley.
Solar Negotiators takes a consultative approach, with in-house design and engineering teams that customize each system for the homeowner’s roof and energy needs. The company handles all permitting, utility interconnection, and post-installation support. Customers consistently praise the company’s transparency, competitive pricing, and responsive customer service.
Service Area
Solar Negotiators serves the following areas within a 75-mile radius:
Contact Information
Are you Solar Negotiators?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
1400 reviews
Brian S.
Solar Negotiators made the entire process easy. From the initial quote to the final inspection, everything was handled professionally. Great warranty too.
Angela R.
Chris Moran and his team are the real deal. Honest pricing, no gimmicks, and an installation that was completed on schedule. Highly recommend.
Daniel K.
The lifetime warranty sold us on Solar Negotiators. Installation was clean and efficient. Our system has been producing more than projected.
Frequently Asked Questions About Solar Negotiators
What services does Solar Negotiators offer?
Solar Negotiators offers Solar Installation, Battery Storage, roofing, Maintenance.
Is Solar Negotiators NABCEP certified?
Yes, Solar Negotiators is NABCEP certified and also holds BBB Accredited, OSHA Certified, Owens Corning Preferred Contractor certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Solar Negotiators serve?
Solar Negotiators serves San Diego, Escondido, Oceanside, Carlsbad, Vista, Poway, Temecula. They are based in San Diego with a service radius of 120 km.
What warranty does Solar Negotiators offer?
Solar Negotiators offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Solar Negotiators's customer reviews?
Solar Negotiators has a 4.8/5 rating based on 1400 customer reviews. Customers consistently rate them highly.
How long has Solar Negotiators been in business?
Solar Negotiators was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in San Diego
Get a Free Solar Quote from Solar Negotiators
Fill in your details and we'll connect you with Solar Negotiators.
Quote request sent!
Solar Negotiators will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile