SO

Solar Optimum

EnergySage Installer of the Year serving Riverside from their Inland Empire office

Riverside, California
4.5 (150 reviews)
Residential Commercial

18+

Years in Business

0

150

Customer Reviews

62 mi

Service Area

201-500

Employees

SurgePV Score

6.8 / 10
Customer Reviews
90%
Certifications
0%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
75%

About Solar Optimum

Solar Optimum is a leading California solar installation company with an Inland Empire office at 4199 Flat Rock Drive, Building 100, Riverside, CA 92505. The company was named the 2024 and 2025 EnergySage Installer of the Year, recognizing its commitment to quality installations and customer satisfaction across the state.

Solar Optimum provides residential and commercial solar panel systems, battery storage solutions, and EV charger installations. The company operates multiple offices across California, including its Riverside/Inland Empire location, and serves communities throughout the region including San Bernardino, Ontario, Rancho Cucamonga, and Corona.

The company operates Monday through Friday from 8 AM to 6 PM and Saturdays from 9 AM to 6 PM. Solar Optimum offers free consultations and handles the entire installation process from design and engineering through permitting, installation, and utility interconnection. The company has built a strong reputation through its EnergySage marketplace presence and consistent customer review scores.

Service Area

Solar Optimum serves the following areas within a 62-mile radius:

RiversideSan BernardinoOntarioRancho CucamongaCorona

Are you Solar Optimum?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

150 reviews

Anthony R.

5 November 2025
Verified Customer

Solar Optimum was named Installer of the Year for good reason. Their team was professional, the equipment was top quality, and the installation was flawless.

Christine L.

22 August 2025
Verified Customer

We chose Solar Optimum based on their EnergySage awards and they delivered. Great communication, competitive pricing, and our system is exceeding production estimates.

Robert D.

8 June 2025
Verified Customer

Professional installation and good equipment. The process took a bit longer than expected due to permitting, but the end result is a high-performing solar system.

Frequently Asked Questions About Solar Optimum

What services does Solar Optimum offer?

Solar Optimum offers Solar Installation, Battery Storage, EV Charging.

Is Solar Optimum NABCEP certified?

Solar Optimum holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does Solar Optimum serve?

Solar Optimum serves Riverside, San Bernardino, Ontario, Rancho Cucamonga, Corona. They are based in Riverside with a service radius of 100 km.

What warranty does Solar Optimum offer?

Solar Optimum offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Optimum's customer reviews?

Solar Optimum has a 4.5/5 rating based on 150 customer reviews. Customers consistently rate them highly.

How long has Solar Optimum been in business?

Solar Optimum was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solar Optimum

Fill in your details and we'll connect you with Solar Optimum.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote