SP

Solar Plus Yorkshire

Independent Yorkshire solar specialist founded by an electronics engineer with 27 years of experience

York, UK
0 (0 reviews)
Verified
Residential Commercial

16+

Years in Business

0

60 km

Service Area

1-10

Employees

SurgePV Score

5.7 / 10
Customer Reviews
0%
Certifications
60%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
50%

About Solar Plus Yorkshire

Solar Plus Yorkshire Ltd is based at 11 Ladywell Road, Boroughbridge, YO51 9HL, and has been operating since 2010. The company was founded by Mark Houldsworth, an electronics engineer who previously ran Cobra Electrical for 27 years. This technical background informs the company’s approach: detailed system design, honest advice, and thorough survey work before any installation commences.

The company is listed on Which? Trusted Traders and Checkatrade, and serves York, Harrogate, Knaresborough, Ripon, and the surrounding North Yorkshire area. Solar Plus Yorkshire specialises in residential and commercial solar PV, battery storage, heat pump installations, and EV charging points. The company is an accredited installer for Hypervolt, MyEnergi Zappi, Pod Point, and Tesla EV chargers.

Solar Plus Yorkshire holds MCS accreditation and was among a small number of UK companies to achieve Schletter and SolarWorld installer accreditation, reflecting the technical rigour expected by those panel manufacturers. Customer reviews across Checkatrade and Which? Trusted Traders highlight Mark’s depth of knowledge, transparent pricing, and a professional installation team that leaves sites clean and tidy.

For homeowners in York and North Yorkshire looking for an independent, technically-led solar installer with a long track record in the region, Solar Plus Yorkshire is a well-regarded local option. Contact is available on 01423 322915 or by email at [email protected].

Service Area

Solar Plus Yorkshire serves the following areas within a 60 km radius:

YorkBoroughbridgeKnaresboroughHarrogateRiponWetherby

Are you Solar Plus Yorkshire?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Panels

SolarWorld

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

0

0 reviews

Which? Trusted Traders Customer

1 April 2024
Verified Customer

Mark and his team provided a first class service. Impressive knowledge of solar systems and real enthusiasm for meeting customer requirements. The installation team were polite and focused throughout.

Frequently Asked Questions About Solar Plus Yorkshire

What services does Solar Plus Yorkshire offer?

Solar Plus Yorkshire offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Solar Plus Yorkshire MCS certified?

Yes, Solar Plus Yorkshire is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Solar Plus Yorkshire serve?

Solar Plus Yorkshire serves York, Boroughbridge, Knaresborough, Harrogate, Ripon, Wetherby. They are based in York with a service radius of 60 km.

What warranty does Solar Plus Yorkshire offer?

Solar Plus Yorkshire offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Solar Plus Yorkshire's customer reviews?

Solar Plus Yorkshire does not have any reviews yet. Be the first to leave a review after using their services.

How long has Solar Plus Yorkshire been in business?

Solar Plus Yorkshire was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Solar Plus Yorkshire

Fill in your details and we'll connect you with Solar Plus Yorkshire.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote